Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID 215611
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
6B 215611 Convict Lake Campground WTF Campground Inyo Nat'L Forest Mmth Rgr Stt Mammoth Lakes, CA, 93546 Mono

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
48208 Organization USDA Forest Service Inyo National Forest Mammoth Lakes Owner Federal Agency 12/10/1981
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
146807 WDR 6V WDRMUNIOTH 95-037 6B260705001 03/09/1995 03/09/2010 Active N
147932 WDR 6V WDRMUNIOTH 81-108 6B260705001 12/10/1981 12/10/1991 Historical N
Total Reg Measures: 2

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1142830 07/15/2024 DMON Total monthly flows and average daily flows were not reported in Second Quarter 2024 Report. Violation B Report
1142850 07/15/2024 LREP According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 7/15/2024 but not submitted until 8/2/2024. Violation B Report
1142832 06/01/2024 Order Conditions Freeboard Instantaneous Minimum limit is 24 inches and reported value was 15 inches. Violation B Report
1142831 05/28/2024 Order Conditions Freeboard Instantaneous Minimum limit is 24 inches and reported value was 20 inches. Violation B Report
1142849 04/15/2024 LREP According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 4/15/2024 but not submitted until 8/2/2024. Violation B Report
1142827 01/15/2024 DMON Freeboard for Pond #1 and Pond #2 was not measured in December 2023. Violation B Report
1142828 01/15/2024 DMON Total monthly flows and average daily flows were not reported in Fourth Quarter 2023 Report. Violation B Report
1142856 01/15/2024 Deficient Reporting According to the MRP No. 97-37, Pg. 3 Section II.C. states submittal period requirements. These requirements state, "By January 15 of each year, the Discharger shall submit an annual report to the Regional Board..." This report was due on 1/15/2024 but not submitted. Violation B Report
1142847 01/15/2024 LREP According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 1/15/2024 but not submitted until 8/3/2024. Violation B Report
1142628 10/15/2023 DMON Total monthly flows and average daily flows were not reported in Third Quarter 2023 Report. Violation B Report
1142846 10/15/2023 LREP According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 10/15/2023 but not submitted until 8/3/2024. Violation B Report
1142627 07/15/2023 DMON Total monthly flows and average daily flows were not reported in Second Quarter 2023 Report. Violation B Report
1142845 07/15/2023 LREP According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 7/15/2023 but not submitted until 8/2/2024. Violation B Report
1142626 04/15/2023 DMON Total monthly flows and average daily flows were not reported in First Quarter 2023 Report. Violation B Report
1142844 04/15/2023 LREP According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 4/15/2023 but not submitted until 8/2/2024. Violation B Report
1142855 01/15/2023 Deficient Reporting According to the MRP No. 97-37, Pg. 3 Section II.C. states submittal period requirements. These requirements state, "By January 15 of each year, the Discharger shall submit an annual report to the Regional Board..." This report was due on 1/15/2023 but not submitted. Violation B Report
1142843 01/15/2023 LREP According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 1/15/2023 but not submitted until 2/3/2023. Violation B Report
1142621 12/31/2022 DMON Freeboard for Pond #1 and Pond #2 was not measured in December 2022. Violation B Report
1142840 10/15/2022 LREP According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 10/15/2022 but not submitted until 2/3/2023. Violation B Report
1142838 07/15/2022 LREP According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 7/15/2022 but not submitted until 8/26/2022. Violation B Report
1105738 06/16/2022 Order Conditions During an inspection that occurred on June 16th, 2022, by TJ Middlemis-Clark, TJ observed that the irrigation site did not have fencing. Section I.B.4. states reclamation requirements. These requirements state, "The irrigation sites shall be properly fenced and posted to restrict public access and warn of the presence of sewage." Violation B Inspection
1142837 04/15/2022 LREP According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 4/15/2022 but not submitted until 8/26/2022. Violation B Report
1105736 01/18/2022 LREP According to the WDR, Pg. 16 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 1/15/2022 but not submitted until 3/11/2022. Violation B Report
1142854 01/15/2022 Deficient Reporting According to the MRP No. 97-37, Pg. 3 Section II.C. states submittal period requirements. These requirements state, "By January 15 of each year, the Discharger shall submit an annual report to the Regional Board..." This report was due on 1/15/2022 but not submitted. Violation B Report
1142835 01/15/2022 LREP According to the MRP No. 97-37, Pg. 3 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 1/15/2022 but not submitted until 3/11/2022. Violation B Report
1105735 10/18/2021 LREP According to the WDRs, Pg. 16 Section II.B. states submittal period requirements. These requirements state, "By not later than the 15th day of the month following the adoption of this Order, the Discharger shall submit a monitoring report including the preceding information to the Regional Board. Subsequent monitoring reports shall be submitted to the Regional Board by the 15th day following each quarter." This report was due on 10/15/2021 but not submitted until 3/11/2022. Violation B Report
1091464 04/15/2021 LREP Missing first quarter report for 2021 as required by II.B. Submittal Periods Violation B Report
1142852 01/15/2021 Deficient Reporting According to the MRP No. 97-37, Pg. 3 Section II.C. states submittal period requirements. These requirements state, "By January 15 of each year, the Discharger shall submit an annual report to the Regional Board..." This report was due on 1/15/2021 but not submitted. Violation B Report
1091466 01/15/2021 Deficient Reporting Missing annual report for 2020 as required by II.C. Annual Report Violation B Report
1091463 01/01/2021 Deficient Reporting Missing sludge monitoring data for fourth quarter report of 2020 as required by I.C. Sludge Monitoring Violation B Report
1082292 10/15/2020 LREP No SMR submitted.Violates Board Order 6-95-37 MRP II.B. Discharger did not propose or identify any corrective actions taken. Violation B Report
1082291 07/15/2020 LREP Quarterly monitoring reports shall be submitted by the 15th day of the following quarter. The 2020 2nd Quarter Monitoring Report was due on 7/15/2020 but was not turned in. Violates Board Order 6-95-37 MRP II.B. Discharger did not propose or identify any corrective actions taken. Violation B Report
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 32 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
DMON = Deficient Monitoring Deficient Reporting = Deficient Reporting
LREP = Late Report Order Conditions = Order Conditions

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
449832 Notice of Violation 09/12/2022 Historical
449822 Staff Enforcement Letter null 06/23/2022 Historical
444033 Staff Enforcement Letter null 06/30/2021 Historical
442673 Oral Communication 03/22/2021 Historical
406757 Oral Communication 06/09/2016 Historical
399876 Oral Communication 02/18/2015 Historical
252769 Staff Enforcement Letter 05/18/2004 Historical
244886 Oral Communication 02/15/2001 Historical
244034 Staff Enforcement Letter 05/18/2000 Historical
243632 Oral Communication 02/01/2000 Historical
Total Enf Actions: 10

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
48081493 B Type compliance inspection Timothy Middlemis-Clark 06/16/2022 N 0 Download
28948944 B Type compliance inspection Thomas Edward Browne 06/06/2017 Y 0 [Attachments]
24715618 B Type compliance inspection Thomas Edward Browne 05/25/2016 Y 0 N/A
295873 B Type compliance inspection Brad Nelson 08/17/1995 Y 0 N/A
295872 B Type compliance inspection Thomas S. Howard 07/19/1994 Y 0 N/A
295871 B Type compliance inspection Unknown u 06/23/1994 Y 0 N/A
Total Inspections: 6 Last Inspection: 06/16/2022
  
The current report was generated with data as of: 06/20/2025
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page