Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1143574 |
04/01/2025 |
Order Conditions |
Log Deck Pond exceeded its 2-foot freeboard requirement until April 6, 2025. The 2-foot freeboard requirement has been achieved from April 6, 2025, through the entire month of April. |
Freeboard requirement achieved. |
Violation |
U |
eSMR |
1142154 |
03/28/2025 |
Order Conditions |
The measured value for total Aluminum from the samples collected at discharge point SW-001 on 3/28/2025, was 1550 ug/L which exceeded the Storm Water Action Level of 750 ug/L. |
The BMP Improvement Evaluation, submitted on 3/9/2020 will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1142156 |
03/28/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point SW-001 on 3/28/2025, was 1940 ug/L which exceeded the Storm Water Action Level of 1000 ug/L. |
The BMP Improvement Evaluation, submitted on 3/9/2020 will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1142153 |
03/05/2025 |
Order Conditions |
The measured value for total Aluminum from the samples collected at discharge point SW-001 on 3/5/2025, was 1430 ug/L which exceeded the Storm Water Action Level of 750 ug/L. |
The BMP Improvement Evaluation, submitted on 3/9/2020 will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1142155 |
03/05/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point SW-001 on 3/5/2025, was 2090 ug/L which exceeded the Storm Water Action Level of 1000 ug/L. |
The BMP Improvement Evaluation, submitted on 3/9/2020 will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1143606 |
02/28/2025 |
Other Water Code Sections |
Failure to provide a report of waste discharge 180 days in advance of the discharge of waste is a violation of CWC Section 13376. (2/5/25) (2/11/2025) (2/17/2025) |
|
Violation |
B |
Report |
1142152 |
02/28/2025 |
Order Conditions |
The Discharger failed to maintain a freeboard of 2 feet or greater in the power plant
pond and the log deck pond and the inability to maintain adequate freeboard was not
due to direct precipitation or storm water runoff occurring as a result of annual
precipitation with a greater than 100-year recurrence interval, or a storm event with an
intensity greater than a 25-year, 24-hour storm event. |
Freeboard issues due to equipment problems with the VSEP unit and plant processing issues cause by wet fuel. |
Violation |
B |
eSMR |
1141487 |
02/28/2025 |
Order Conditions |
The measured value for total Aluminum from the samples collected at discharge point SW-001 on 2/28/2025 was 2050 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. |
The BMP Improvement Evaluation, submitted on 03/09/2020, will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1141485 |
02/28/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point SW-001 on 2/28/2025 was 2390 ug/L, which exceeded the Storm Water Action Legel of 1000 ug/L. |
The BMP Improvement Evaluation, submitted on 03/09/2020, will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1143630 |
02/28/2025 |
Order Conditions |
The power plant pond had a pH greater than 9.0 standard units following the 11
February 2025 and the 16/17 February 2025 unauthorized discharge events. The storm
water retention pond had a pH greater than 9.0 standard units following the 11 February
2025 discharge event. |
|
Violation |
B |
Report |
1143607 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.A. (2/5/2025) (2/11/2025) (2/17/2025) |
|
Violation |
B |
Report |
1143608 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.B. (2/5/2025) (2/11/2025) (2/17/2025) |
|
Violation |
B |
Report |
1143609 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.D. (2/11/2025) (2/17/2025) |
|
Violation |
B |
Report |
1143611 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.E. (2/5/2025) (2/11/2025) (2/17/2025) |
|
Violation |
B |
Report |
1143612 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.F. (2/11/2025) (2/17/2025) |
|
Violation |
B |
Report |
1143619 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.H. (2/11/2025) (2/17/2025) |
|
Violation |
B |
Report |
1143618 |
02/28/2025 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibitions III.I. (2/11/2025) (2/17/2025) |
|
Violation |
B |
Report |
1141488 |
02/13/2025 |
Order Conditions |
The measured value for total Aluminum from the samples collected at discharge point SW-001 on 2/13/2025 was 2810 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. |
The BMP Improvement Evaluation, submitted on 03/09/2020, will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1141486 |
02/13/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point SW-001 on 2/13/2025 was 2690 ug/L, which exceeded the Storm Water Action Level of 1000 ug/L. |
The BMP Improvement Evaluation, submitted on 03/09/2020, will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1140561 |
01/10/2025 |
Order Conditions |
The measured value for total Aluminum from the samples collected at discharge point EFF-001 on 1/10/2025 was 1390 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. |
The BMP Improvement Evaluation, submitted on 3/9/2020 will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1140558 |
01/10/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point EFF-001 on 1/10/2025 was 1160 ug/L, which exceeded the Storm Water Action Level of 1000 ug/L. |
The BMP Improvement Evaluation, submitted on 3/9/2020 will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1140560 |
01/03/2025 |
DMON |
The measured value for total Aluminum from the samples collected at discharge point EFF-001 on 1/3/2025 was 6280 ug/L, which exceeded the Storm Water Action Level of 750 ug/L. |
The BMP Improvement Evaluation, submitted on 3/9/2020 will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1140559 |
01/03/2025 |
Order Conditions |
The measured value for total Iron from the samples collected at discharge point EFF-001 on 1/3/2025 was 4670 ug/L, which exceeded the Storm Water Action Level of 1000 ug/L. |
The BMP Improvement Evaluation, submitted on 3/9/2020 will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1139093 |
12/28/2024 |
Order Conditions |
Log Deck pond exceeded its freeboard requirement on December 28, 2024 thru December 31, 2024. |
Pond level caused by equipment issues with the VSEP unit and plant processing issues caused by wet fuel. |
Violation |
U |
eSMR |
1142151 |
12/28/2024 |
Order Conditions |
Log Deck pond in freeboard violation from December 28, 2024, thru March 31, 2025. |
Freeboard issues due to equipment problems with VSEP unit and plant processing issues caused by wet fuel. |
Violation |
U |
eSMR |
1140562 |
12/28/2024 |
Order Conditions |
Log deck pond in continuous freeboard violation from December 28, 2024 through entire month of January 2025. |
Freeboard issues due to equipment issues with VSEP unit and plant processing issues caused by wet fuel. |
Violation |
U |
eSMR |
1139089 |
12/28/2024 |
Order Conditions |
Power Plant pond exceeded its freeboard requirement on December 28, 2024 thru December 31, 2024. |
Freeboard issues due to equipment issues with VSEP unit and plant processing issues caused by wet fuel. |
Violation |
U |
eSMR |
1140563 |
12/28/2024 |
Order Conditions |
Power plant pond in freeboard violation from December 28, 2024 through January 12, 2025. |
Freeboard issues due to equipment issues with VSEP unit and plant processing issues caused by wet fuel. |
Violation |
U |
eSMR |
1138310 |
11/24/2024 |
Order Conditions |
Log Deck Pond exceeded the 2ft Freeboard requirement from 11/24/2024 to 12/14/2024. The power plant was unable to process water the entire month of November. In addition, there was an atmospheric river event week of November 21 which dropped 1.5 ft of snow followed with five (5) inches of rain. |
Water Board was promptly notified. Five (5) 20,100 tanks were rented to hold as much water as possible. |
Violation |
U |
eSMR |
1138309 |
11/22/2024 |
Order Conditions |
Power Plant Pond exceeded the 2ft Freeboard requirement from 11/22/2024 to 12/10/2024. The power plant was unable to process water the entire month of November. In addition, there was an atmospheric river event week of November 21 which dropped 1.5 ft of snow followed with five (5) inches of rain. |
Notification was promptly made to water board. Facility rented five (5) 20,100 gallon tanks to hold as much water as possible. |
Violation |
U |
eSMR |
1125103 |
02/14/2024 |
Order Conditions |
The allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 samples result of 2.82 NTU is +1 NTU. The RSW-002 sample result of 4.31 NTUs is an increase of 1.49 NTUs. |
The BMP Improvement Evaluation, submitted on 3/9/2020, will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1125100 |
02/01/2024 |
Order Conditions |
The allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 samples result of 3.48 NTUs is + 1 NTU. The RSW-002 sample result was 5.76 NTUs, which was an increase of 2.26 NTUs. |
The BMP Improvement Evaluation, submitted on 3/9/2020, will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1124331 |
01/03/2024 |
Order Conditions |
The allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 sample result of 5.23 ntu was a 20% increase. The RSW-002 sample result was 8.1 ntu which was an increase of 54%. |
The BMP Improvement Evaluation, submitted on 03/09/2020, will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1112239 |
01/02/2023 |
LREP |
Monthly SMR ( MONNPDES ) report for November 2022 (2418694) was due on 01-JAN-23 |
|
Violation |
B |
Report |
1112512 |
12/31/2022 |
Order Conditions |
The Discharger violated the pond freeboard requirements, specified in section VI.C.4.a.iv. of their permit, at LND-003 on 12/7/22, 12/14/22, 12/21/22, and 12/28/22. |
|
Violation |
B |
Report |
1105939 |
01/03/2022 |
Other Water Code Sections |
Violation of CWC section 13376. Failure to provide a report of discharge 180 days in advance of the discharging from the log deck recycling pond to Canyon Creek, a water of the U.S. |
|
Violation |
B |
Report |
1105935 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.A. |
|
Violation |
B |
Report |
1105936 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.B. |
|
Violation |
B |
Report |
1105937 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.D. |
|
Violation |
B |
Report |
1105938 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.F. |
|
Violation |
B |
Report |
1101297 |
01/03/2022 |
UAUTHDISC |
Unauthorized discharge occurred at log deck pond due to freezing temperatures causing drain valve to fail, which allowed log deck pond water to be discharged from the site. |
Replaced valve with a freeze-tolerant valve |
Violation |
B |
eSMR |
1099690 |
12/14/2021 |
Order Conditions |
Based on results reported for the storm water discharge samples collected on December 14, 2021 at monitoring locations RSW-001 and RSW-002, the allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 sample result was 20% and the total increase was 83%. This was the result of the large rain event directly preceding this sampling event. |
A BMP Improvement Evaluation was conducted to address turbidity, and submitted on 3/9/2020. These BMPs will be revitalized. |
Violation |
U |
eSMR |
1098318 |
11/09/2021 |
Order Conditions |
Based on results reported for the storm water discharge samples collected on November 9, 2021 at monitoring locations RSW-001 and RSW-002, the allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 sample result was 20% and the total increase was 25%. This may have been the result of the large rain event directly preceding this sampling event. |
A BMP Improvement Evaluation was conducted to address turbidity, and submitted on 3/9/2020. These BMPs will be revitalized. |
Violation |
U |
eSMR |
1084928 |
12/17/2020 |
ATOX |
Acute Toxicity-Rainbow Trout-survival Instantaneous Minimum limit is 70 % survival and reported value was 60 % survival at EFF-001. |
Resampling was conducted on this effluent on 1/11/2021 which results in 100% survival. |
Violation |
B |
eSMR |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|