Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1125103 |
02/14/2024 |
Order Conditions |
The allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 samples result of 2.82 NTU is +1 NTU. The RSW-002 sample result of 4.31 NTUs is an increase of 1.49 NTUs. |
The BMP Improvement Evaluation, submitted on 3/9/2020, will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1125100 |
02/01/2024 |
Order Conditions |
The allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 samples result of 3.48 NTUs is + 1 NTU. The RSW-002 sample result was 5.76 NTUs, which was an increase of 2.26 NTUs. |
The BMP Improvement Evaluation, submitted on 3/9/2020, will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1124331 |
01/03/2024 |
Order Conditions |
The allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 sample result of 5.23 ntu was a 20% increase. The RSW-002 sample result was 8.1 ntu which was an increase of 54%. |
The BMP Improvement Evaluation, submitted on 03/09/2020, will continue to be implemented and the BMPs will continue to be revitalized. |
Violation |
U |
eSMR |
1112239 |
01/02/2023 |
LREP |
Monthly SMR ( MONNPDES ) report for November 2022 (2418694) was due on 01-JAN-23 |
|
Violation |
B |
Report |
1112512 |
12/31/2022 |
Order Conditions |
The Discharger violated the pond freeboard requirements, specified in section VI.C.4.a.iv. of their permit, at LND-003 on 12/7/22, 12/14/22, 12/21/22, and 12/28/22. |
|
Violation |
B |
Report |
1105939 |
01/03/2022 |
Other Water Code Sections |
Violation of CWC section 13376. Failure to provide a report of discharge 180 days in advance of the discharging from the log deck recycling pond to Canyon Creek, a water of the U.S. |
|
Violation |
B |
Report |
1105935 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.A. |
|
Violation |
B |
Report |
1105936 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.B. |
|
Violation |
B |
Report |
1105937 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.D. |
|
Violation |
B |
Report |
1105938 |
01/03/2022 |
Order Conditions |
Violation of R5-2019-0048 Discharge Prohibition III.F. |
|
Violation |
B |
Report |
1101297 |
01/03/2022 |
UAUTHDISC |
Unauthorized discharge occurred at log deck pond due to freezing temperatures causing drain valve to fail, which allowed log deck pond water to be discharged from the site. |
Replaced valve with a freeze-tolerant valve |
Violation |
B |
eSMR |
1099690 |
12/14/2021 |
Order Conditions |
Based on results reported for the storm water discharge samples collected on December 14, 2021 at monitoring locations RSW-001 and RSW-002, the allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 sample result was 20% and the total increase was 83%. This was the result of the large rain event directly preceding this sampling event. |
A BMP Improvement Evaluation was conducted to address turbidity, and submitted on 3/9/2020. These BMPs will be revitalized. |
Violation |
U |
eSMR |
1099689 |
12/14/2021 |
Order Conditions |
The measured values for Aluminum from the samples collected at discharge point EFF-001 on 12/14/2021 exceeded the Storm Water Action Level of 750 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1099688 |
12/06/2021 |
Order Conditions |
The measured values for Iron from the samples collected at discharge point EFF-001 on 12/6/2021 and 12/14/2021 exceeded the Storm Water Action Level of 1000 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1098318 |
11/09/2021 |
Order Conditions |
Based on results reported for the storm water discharge samples collected on November 9, 2021 at monitoring locations RSW-001 and RSW-002, the allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 sample result was 20% and the total increase was 25%. This may have been the result of the large rain event directly preceding this sampling event. |
A BMP Improvement Evaluation was conducted to address turbidity, and submitted on 3/9/2020. These BMPs will be revitalized. |
Violation |
U |
eSMR |
1098316 |
11/09/2021 |
Order Conditions |
The measured values for Aluminum from the samples collected at discharge point EFF-001 on 11/9/2021 exceeded the Storm Water Action Level of 750 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1098317 |
11/09/2021 |
Order Conditions |
The measured values for Iron from the samples collected at discharge point EFF-001 on 11/9/2021 exceeded the Storm Water Action Level of 1000 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1098319 |
11/02/2021 |
Order Conditions |
The measured value for COD from the sample collected at discharge point EFF-001 on 11/02/2021 was 122 mg/L, which exceeded the Storm Water Action Level of 120 mg/L. |
A BMP Improvement Evaluation was submitted on 3/9/2020 to address other SWAL exceedances, which BMPs should also help with COD. These BMPs will continue to be implemented and revitalized. |
Violation |
U |
eSMR |
1097403 |
10/25/2021 |
Order Conditions |
The measured value for COD from the sample collected at discharge point EFF-001 on 10/25/2021 exceeded the Storm Water Action Level of 120 mg/L. |
A BMP Improvement Evaluation was submitted on 3/9/2020 to address other SWAL exceedances, which BMPs should also help with COD. These BMPs will continue to be implemented and revitalized. |
Violation |
U |
eSMR |
1097402 |
10/25/2021 |
Order Conditions |
The measured values for Aluminum from the samples collected at discharge point EFF-001 on 10/25/2021 exceeded the Storm Water Action Level of 750 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1097404 |
10/25/2021 |
Order Conditions |
The measured values for Iron from the samples collected at discharge point EFF-001 on 10/25/2021 exceeded the Storm Water Action Level of 1000 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1090145 |
04/01/2021 |
Order Conditions |
The measured values for Iron from the samples collected at discharge point EFF-001 on 4/1/2021 and 4/9/2021 exceeded the Storm Water Action Level of 1000 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1089174 |
03/02/2021 |
Order Conditions |
The measured values for Aluminum from the samples collected at discharge point EFF-001 on 3/2/2021 and 3/17/2021 exceeded the Storm Water Action Level of 750 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1089175 |
03/02/2021 |
Order Conditions |
The measured values for Iron from the samples collected at discharge point EFF-001 on 3/2/2021 and 3/17/2021 exceeded the Storm Water Action Level of 1000 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1087795 |
02/04/2021 |
Order Conditions |
The measured value for COD from the sample collected at discharge point EFF-001 on 2/4/2021 exceeded the Storm Water Action Level of 120 mg/L. |
A BMP Improvement Evaluation was submitted on 3/9/2020 to address other SWAL exceedances, which BMPs should also help with COD. These BMPs will continue to be implemented and revitalized. |
Violation |
U |
eSMR |
1087793 |
02/04/2021 |
Order Conditions |
The measured values for Aluminum from the samples collected at discharge point EFF-001 on 2/4/2021 and 2/17/2021 exceeded the Storm Water Action Level of 750 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1087794 |
02/04/2021 |
Order Conditions |
The measured values for Iron from the samples collected at discharge point EFF-001 on 2/4/2021 and 2/17/2021 exceeded the Storm Water Action Level of 1000 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1085588 |
01/05/2021 |
Order Conditions |
The measured value for COD from the sample collected at discharge point EFF-001 on 1/5/2021 exceeded the Storm Water Action Level of 120 mg/L. |
A BMP Improvement Evaluation was submitted on 3/9/2020 to address other SWAL exceedances, which BMPs should also help with COD. These BMPs will continue to be implemented and revitalized. |
Violation |
U |
eSMR |
1085589 |
01/05/2021 |
Order Conditions |
The measured value for Electrical Conductivity from the sample collected at discharge point EFF-001 on 1/28/2021 exceeded the Storm Water Action Level of 700 umhos/cm. |
A BMP Improvement Evaluation was conducted to address electrical conductivity, and submitted on 3/9/2020. |
Violation |
U |
eSMR |
1085590 |
01/05/2021 |
Order Conditions |
The measured values for Aluminum from the samples collected at discharge point EFF-001 on 1/5/2021 and 1/11/2021 exceeded the Storm Water Action Level of 750 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1085587 |
01/05/2021 |
Order Conditions |
The measured values for Iron from the samples collected at discharge point EFF-001 on 1/5/2021 and 1/11/2021 exceeded the Storm Water Action Level of 1000 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1084925 |
12/17/2020 |
Order Conditions |
The measured value for Aluminum from the sample collected at discharge point EFF-001 on 12/17/2020 exceeded the Storm Water Action Level of 750 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1084927 |
12/17/2020 |
Order Conditions |
The measured value for COD from the sample collected at discharge point EFF-001 on 12/17/2020 exceeded the Storm Water Action Level of 120 mg/L. |
A BMP Improvement Evaluation was submitted on 3/9/2020 to address other SWAL exceedances, which BMPs should also help with COD. These BMPs will continue to be implemented and revitalized. |
Violation |
U |
eSMR |
1084926 |
12/17/2020 |
Order Conditions |
The measured value for Iron from the sample collected at discharge point EFF-001 on 12/17/2020 exceeded the Storm Water Action Level of 1000 ug/L. |
A BMP Improvement Evaluation which was submitted on 3/9/2020 will continue to be implemented and BMPs will be revitalized. |
Violation |
U |
eSMR |
1084928 |
12/17/2020 |
ATOX |
Acute Toxicity-Rainbow Trout-survival Instantaneous Minimum limit is 70 % survival and reported value was 60 % survival at EFF-001. |
Resampling was conducted on this effluent on 1/11/2021 which results in 100% survival. |
Violation |
B |
eSMR |
1075668 |
05/21/2020 |
Order Conditions |
Aluminum, Total Instantaneous Maximum limit is 750 ug/L and reported value was 3920 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address aluminum, and submitted on 3/9/2020. This will be implemented during the dry season. |
Violation |
B |
eSMR |
1075667 |
05/21/2020 |
Order Conditions |
Iron, Total Recoverable storm water action level is 1000 ug/L and reported value was 3490 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address iron, and submitted on 3/9/2020 and will be implemented in the dry season. |
Violation |
B |
eSMR |
1075201 |
04/27/2020 |
DMON |
Flow was not measured. However, the Discharger estimates that the flow was 1027122 GPD at EFF-001. |
The corrective action put in place is to have the oncoming shift operator verify the previous operator has taken the flow measurement. |
Violation |
B |
eSMR |
1075199 |
04/16/2020 |
Order Conditions |
Aluminum, Total Recoverable storm water action level is 1000 ug/L and reported value was 1230 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address aluminum, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1075202 |
04/16/2020 |
Order Conditions |
Iron, Total Recoverable storm water action level is 1000 ug/L and reported value was 1400 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address iron, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1075200 |
04/02/2020 |
Order Conditions |
Aluminum, Total Recoverable storm water action level is 1000 ug/L and reported value was 1940 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address aluminum, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1075203 |
04/02/2020 |
Order Conditions |
Iron, Total Recoverable storm water action level is 1000 ug/L and reported value was 1970 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address iron, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1073302 |
03/19/2020 |
Order Conditions |
Aluminum, Total Recoverable storm water action level is 750 ug/L and reported value was 907 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address aluminum, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1073304 |
03/19/2020 |
Order Conditions |
Iron, Total Recoverable storm water action level is 1000 ug/L and reported value was 1130 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address iron, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1073301 |
03/03/2020 |
Order Conditions |
Aluminum, Total Recoverable storm water action level is 750 ug/L and reported value was 765 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address aluminum, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1073303 |
03/03/2020 |
Order Conditions |
Iron, Total Recoverable storm water action level is 1000 ug/L and reported value was 1170 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address iron, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1072012 |
02/19/2020 |
Order Conditions |
Aluminum, Total Recoverable storm water action level is 750 ug/L and reported value was 945 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address aluminum, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1072009 |
02/19/2020 |
Order Conditions |
Iron, Total Recoverable storm water action level is 1000 ug/L and reported value was 1320 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address iron, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1072011 |
02/06/2020 |
Order Conditions |
Aluminum, Total Recoverable storm water action level is 750 ug/L and reported value was 1360 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address aluminum, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1072010 |
02/06/2020 |
Order Conditions |
Iron, Total Recoverable storm water action level is 1000 ug/L and reported value was 1540 ug/L at EFF-001. |
A BMP Improvement Evaluation was conducted to address iron, and submitted on 3/9/2020. |
Violation |
B |
eSMR |
1071310 |
01/21/2020 |
Order Conditions |
Aluminum, Total Recoverable storm water action level is 750 ug/L and reported value was 3780 ug/L at EFF-001. |
A BMP Improvement Evaluation is currently being conducted to address aluminum at this discharge point. |
Violation |
B |
eSMR |
1071314 |
01/21/2020 |
Order Conditions |
Electrical Conductivity @ 25 Deg. C storm water action level is 700 umhos/cm and reported value was 782 umhos/cm at EFF-001. |
BFP is currently required to submit a Salinity Evaluation and Minimization Plan by August 1, 2020, therefore, BFP requests to address salinity in the Salinity Evaluation and Minimization Plan in lieu of conducting a separate BMP Improvement Evaluation Plan from the one currently being conducted for Iron, Aluminum, and COD. |
Violation |
B |
eSMR |
1071312 |
01/21/2020 |
Order Conditions |
Iron, Total Recoverable storm water action level is 1000 ug/L and reported value was 3410 ug/L at EFF-001. |
A BMP Improvement Evaluation is currently being conducted to address iron. |
Violation |
B |
eSMR |
1071313 |
01/21/2020 |
Surface Water |
Based on results reported for the storm water discharge samples collected on January 21, 2020 at monitoring locations RSW-001 and RSW-002, the allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 sample result of 6.43 NTU was a 20% increase. The RSW-002 sample result was 8.38 NTU, which was an increase of 30%. |
BFP has conducted BMP Improvements that are specifically designed to reduce aluminum, iron, turbidity, and COD levels in the storm water effluent. Over the past summer dry season, BFP contracted with an erosion control company to install new and replace existing erosion/sediment BMPs. BFP will continue to monitor aluminum, iron, turbidity, and COD levels closely to determine the effectiveness of these improvements and opportunities for additional measures that may be applied. A BMP Improvement Evaluation is also currently being conducted to address aluminum, iron, and COD. This evaluation will also include an evaluation of BMP improvements to improve turbidity. |
Violation |
B |
eSMR |
1071311 |
01/09/2020 |
Order Conditions |
Iron, Total Recoverable storm water action level is 1000 ug/L and reported value was 1340 ug/L at EFF-001. |
A BMP Improvement Evaluation is currently being conducted to address iron. |
Violation |
B |
eSMR |
1070160 |
12/23/2019 |
Order Conditions |
Aluminum, Total Recoverable storm water action level is 750 ug/L and reported value was 2140 ug/L at EFF-001. |
BFP has conducted BMP Improvements that are specifically designed to reduce aluminum, iron, turbidity, and COD levels in the storm water effluent. Over the past summer dry season, BFP contracted with an erosion control company to install new and replace existing erosion/sediment BMPs. BFP will continue to monitor aluminum, iron, turbidity, and COD levels closely to determine the effectiveness of these improvements and opportunities for additional measures that may be applied. A BMP Improvement Evaluation is also currently being conducted to address aluminum, iron, and COD. This evaluation will also include an evaluation of BMP improvements to improve turbidity. |
Violation |
B |
eSMR |
1070161 |
12/23/2019 |
Order Conditions |
Iron, Total Recoverable storm water action level is 1000 ug/L and reported value was 2160 ug/L at EFF-001. |
BFP has conducted BMP Improvements that are specifically designed to reduce aluminum, iron, turbidity, and COD levels in the storm water effluent. Over the past summer dry season, BFP contracted with an erosion control company to install new and replace existing erosion/sediment BMPs. BFP will continue to monitor aluminum, iron, turbidity, and COD levels closely to determine the effectiveness of these improvements and opportunities for additional measures that may be applied. A BMP Improvement Evaluation is also currently being conducted to address aluminum, iron, and COD. This evaluation will also include an evaluation of BMP improvements to improve turbidity. |
Violation |
A |
eSMR |
1070158 |
12/09/2019 |
Order Conditions |
Aluminum, Total Recoverable storm water action level is 750 ug/L and reported value was 5210 ug/L at EFF-001. |
BFP has conducted BMP Improvements that are specifically designed to reduce aluminum, iron, turbidity, and COD levels in the storm water effluent. Over the past summer dry season, BFP contracted with an erosion control company to install new and replace existing erosion/sediment BMPs. BFP will continue to monitor aluminum, iron, turbidity, and COD levels closely to determine the effectiveness of these improvements and opportunities for additional measures that may be applied. A BMP Improvement Evaluation is also currently being conducted to address aluminum, iron, and COD. This evaluation will also include an evaluation of BMP improvements to improve turbidity. |
Violation |
B |
eSMR |
1070157 |
12/09/2019 |
Order Conditions |
Chemical Oxygen Demand (COD) storm water action level is 120 ug/L and reported value was 134 ug/L at EFF-001. |
BFP has conducted BMP Improvements that are specifically designed to reduce aluminum, iron, turbidity, and COD levels in the storm water effluent. Over the past summer dry season, BFP contracted with an erosion control company to install new and replace existing erosion/sediment BMPs. BFP will continue to monitor aluminum, iron, turbidity, and COD levels closely to determine the effectiveness of these improvements and opportunities for additional measures that may be applied. A BMP Improvement Evaluation is also currently being conducted to address aluminum, iron, and COD. This evaluation will also include an evaluation of BMP improvements to improve turbidity. |
Violation |
B |
eSMR |
1070162 |
12/09/2019 |
Order Conditions |
Iron, Total Recoverable storm water action level is 1000 ug/L and reported value was 4410 ug/L at EFF-001. |
? BFP has conducted BMP Improvements that are specifically designed to reduce aluminum, iron, turbidity, and COD levels in the storm water effluent. Over the past summer dry season, BFP contracted with an erosion control company to install new and replace existing erosion/sediment BMPs. BFP will continue to monitor aluminum, iron, turbidity, and COD levels closely to determine the effectiveness of these improvements and opportunities for additional measures that may be applied. A BMP Improvement Evaluation is also currently being conducted to address aluminum, iron, and COD. This evaluation will also include an evaluation of BMP improvements to improve turbidity. |
Violation |
B |
eSMR |
1070159 |
12/09/2019 |
Surface Water |
Based on results reported for the storm water discharge samples collected on December 9, 2019 at monitoring locations RSW-001 and RSW-002, the allowed increase in receiving water turbidity was exceeded. The allowed increase in receiving water turbidity based on the RSW-001 sample result was 1 NTU and the total increase was 3 NTU. This may have been the result of the large rain event directly preceding this sampling event. |
BFP has conducted BMP Improvements that are specifically designed to reduce aluminum, iron, turbidity, and COD levels in the storm water effluent. Over the past summer dry season, BFP contracted with an erosion control company to install new and replace existing erosion/sediment BMPs. BFP will continue to monitor aluminum, iron, turbidity, and COD levels closely to determine the effectiveness of these improvements and opportunities for additional measures that may be applied. A BMP Improvement Evaluation is also currently being conducted to address aluminum, iron, and COD. This evaluation will also include an evaluation of BMP improvements to improve turbidity. |
Violation |
U |
eSMR |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|