General Information
Region Place ID Place Name Place Type Place Address Place County
4 208276 Avalon WWTF Wastewater Treatment Facility 123 Pebbly Beach Avalon, CA, 90704 Los Angeles

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
641842 Person David E West Is Onsite Manager For 09/26/2023
640873 Person Thomas M Brown Is Onsite Manager For 08/01/2023
633134 Person Eric Williamson Is A Data Submitter For 05/15/2022
632448 Person Ron A Tobey Is Onsite Manager For 05/13/2022
620402 Person Sohini Bagchi Is A Data Submitter For 12/01/2020 05/10/2023
552382 Person Denise Radde Contact 04/01/2019
550505 Person Van Madding Is Onsite Manager For 04/01/2015
549247 Person Cliff Casanova Is Onsite Manager For 12/15/2014 11/19/2015
544098 Organization Environ Strategy Consultants, Inc Operator Privately-Owned Business 01/09/2014
544847 Person Ben Harvey Contact 01/09/2014
530246 Person David Clary Is Onsite Manager For 08/06/2012 11/19/2015
526171 Person Ryan Bonner Is Onsite Manager For 03/08/2011 12/31/2013
524157 Person Brent Brady Is Onsite Manager For 10/19/2010 03/04/2013
523118 Person Mike Jones Is Onsite Manager For 06/21/2010 02/01/2011
521812 Person Charles Wagner Is Onsite Manager For 03/23/2010 01/30/2013
521645 Person Steven Matthews Is Onsite Manager For 03/16/2010 06/10/2010
335662 Person Ralph Sogliuzzo Is Onsite Manager For 08/02/2006 09/27/2012
300595 Person Michael Jones Is Onsite Manager For 07/26/2006 03/04/2013
3672 Organization Avalon City Owner City Agency 08/27/1979
Total Related Parties: 19

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
440287 Co-Permitee SB SLIC 2020-0015-DWQ 4B190100001 07/09/2020 Active N
424707 NPDES Permit 4 NPDMUNILRG R4-2019-0023 4B190100001 04/01/2019 03/31/2024 Active N
388401 NPDES Permit 4 NPDMUNILRG R4-2013-0182 4B190100001 02/01/2014 01/31/2019 Historical N
349073 NPDES Permit 4 NPDMUNILRG R4-2008-0028 4B190100001 06/20/2008 04/10/2013 Historical N
313242 NPDES Permit 4 NPDMUNILRG R4-2002-0094 4B190100001 06/14/2002 12/31/2007 Historical N
135061 NPDES Permit 4 NPDMUNILRG 94-069 4B190100001 07/18/1994 07/10/1999 Historical N
135197 NPDES Permit 4 NPDMUNILRG 85-052 4B190100001 08/26/1985 08/10/1990 Historical N
133759 NPDES Permit 4 NPDMUNILRG 79-137 4B190100001 08/27/1979 08/10/1984 Historical N
Total Reg Measures: 8

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
1125278 02/29/2024 CAT1 Total Suspended Solids (TSS), Percent Removal Monthly Average limit is 85 % and reported value was 83.6 % at EFF-001. Operators noticed an unusual increase in flow from previous storm events with similar inches of rainfall. Operators performed an investigation during the lighter periods of the storms to find any sources of I/I. Major sources of inflow were found around the city and were brought up to the City of Avalon. Since then, we have worked with the city to eliminate or reduce these sources of inflow. The investigation is ongoing. Violation U eSMR
1124280 01/31/2024 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 30 mg/L and reported value was 51.7 mg/L at EFF-001. Facility staff will continue to keep a close watch on effluent TSS to ensure that the process has completely stabilized and kept on track. The addition of a disc filter being installed between the clarifier common channel and the chlorine contact basin is currently being proposed to the city. This addition would greatly aid in the prevention of any further TSS exceedances. Violation U eSMR
1124282 01/31/2024 CAT1 Total Suspended Solids (TSS), Percent Removal Monthly Average limit is 85 % and reported value was 63.3 % at EFF-001. Facility staff will continue to keep a close watch on effluent TSS to ensure that the process has completely stabilized and kept on track. The addition of a disc filter being installed between the clarifier common channel and the chlorine contact basin is currently being proposed to the city. This addition would greatly aid in the prevention of any further TSS exceedances. Violation U eSMR
1124284 01/19/2024 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 65.4 mg/L at EFF-001. Facility staff will continue to keep a close watch on effluent TSS to ensure that the process has completely stabilized and kept on track. The addition of a disc filter being installed between the clarifier common channel and the chlorine contact basin is currently being proposed to the city. This addition would greatly aid in the prevention of any further TSS exceedances. Violation U eSMR
1124283 01/12/2024 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 53.1 mg/L at EFF-001. Facility staff will continue to keep a close watch on effluent TSS to ensure that the process has completely stabilized and kept on track. The addition of a disc filter being installed between the clarifier common channel and the chlorine contact basin is currently being proposed to the city. This addition would greatly aid in the prevention of any further TSS exceedances. Violation U eSMR
1124281 01/05/2024 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 54.6 mg/L at EFF-001. Facility staff will continue to keep a close watch on effluent TSS to ensure that the process has completely stabilized and kept on track. The addition of a disc filter being installed between the clarifier common channel and the chlorine contact basin is currently being proposed to the city. This addition would greatly aid in the prevention of any further TSS exceedances. Violation U eSMR
1123284 12/31/2023 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 30 mg/L and reported value was 55.5 mg/L at EFF-001. The Avalon Wastewater Treatment Facility started a rehab project on the contact chamber on 11/28/2023. The contact chamber needed to be bypassed for this project and fed straight to the effluent pipe to the outfall. Due to the damage of the diversion walls and surrounding concrete in the contact chamber, this project was critical to complete. However, due to the loss of contact time through the contact basin and the turbulence of the flow through the common channel before entering the bypass, TSS problems were present with our effluent. The contact basin was brought back online on 1/15/2024 and is resuming normal operations. Violation U eSMR
1123285 12/31/2023 CAT1 Total Suspended Solids (TSS), Percent Removal Monthly Average limit is 85 % and reported value was 70.1 % at EFF-001. The Avalon Wastewater Treatment Facility started a rehab project on the contact chamber on 11/28/2023. The contact chamber needed to be bypassed for this project and fed straight to the effluent pipe to the outfall. Due to the damage of the diversion walls and surrounding concrete in the contact chamber, this project was critical to complete. However, due to the loss of contact time through the contact basin and the turbulence of the flow through the common channel before entering the bypass, TSS problems were present with our effluent. The contact basin was brought back online on 1/15/2024 and is resuming normal operations. Violation U eSMR
1123283 12/29/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 53.2 mg/L at EFF-001. The Avalon Wastewater Treatment Facility started a rehab project on the contact chamber on 11/28/2023. The contact chamber needed to be bypassed for this project and fed straight to the effluent pipe to the outfall. Due to the damage of the diversion walls and surrounding concrete in the contact chamber, this project was critical to complete. However, due to the loss of contact time through the contact basin and the turbulence of the flow through the common channel before entering the bypass, TSS problems were present with our effluent. The contact basin was brought back online on 1/15/2024 and is resuming normal operations. Violation U eSMR
1123279 12/22/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 58.4 mg/L at EFF-001. The Avalon Wastewater Treatment Facility started a rehab project on the contact chamber on 11/28/2023. The contact chamber needed to be bypassed for this project and fed straight to the effluent pipe to the outfall. Due to the damage of the diversion walls and surrounding concrete in the contact chamber, this project was critical to complete. However, due to the loss of contact time through the contact basin and the turbulence of the flow through the common channel before entering the bypass, TSS problems were present with our effluent. The contact basin was brought back online on 1/15/2024 and is resuming normal operations.. Violation U eSMR
1123282 12/15/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 58.9 mg/L at EFF-001. The Avalon Wastewater Treatment Facility started a rehab project on the contact chamber on 11/28/2023. The contact chamber needed to be bypassed for this project and fed straight to the effluent pipe to the outfall. Due to the damage of the diversion walls and surrounding concrete in the contact chamber, this project was critical to complete. However, due to the loss of contact time through the contact basin and the turbulence of the flow through the common channel before entering the bypass, TSS problems were present with our effluent. The contact basin was brought back online on 1/15/2024 and is resuming normal operations. Violation U eSMR
1123281 12/08/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 57.1 mg/L at EFF-001. The Avalon Wastewater Treatment Facility started a rehab project on the contact chamber on 11/28/2023. The contact chamber needed to be bypassed for this project and fed straight to the effluent pipe to the outfall. Due to the damage of the diversion walls and surrounding concrete in the contact chamber, this project was critical to complete. However, due to the loss of contact time through the contact basin and the turbulence of the flow through the common channel before entering the bypass, TSS problems were present with our effluent. The contact basin was brought back online on 1/15/2024 and is resuming normal operations. Violation U eSMR
1123280 12/01/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 61.9 mg/L at EFF-001. The Avalon Wastewater Treatment Facility started a rehab project on the contact chamber on 11/28/2023. The contact chamber needed to be bypassed for this project and fed straight to the effluent pipe to the outfall. Due to the damage of the diversion walls and surrounding concrete in the contact chamber, this project was critical to complete. However, due to the loss of contact time through the contact basin and the turbulence of the flow through the common channel before entering the bypass, TSS problems were present with our effluent. The contact basin was brought back online on 1/15/2024 and is resuming normal operations. Violation U eSMR
1121772 09/30/2023 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 30 mg/L and reported value was 48.5 mg/L at EFF-001. Reduced MLSS concentrations to desired levels of ~1900 mg/L. No DO probes in aeration basins for continuous data. Currently have a trial YSI probe in aeration basin #1 and will install DO probes in each basin after trials. Blower project progressing. Adjusted process flow for better contact time for polymers. Added WE-2013 polymer tote before clarifiers. Cleaned out contact basin twice and cleaned out all clarifiers. Using 12.5% hypochlorite in contact basin. Offered future disc filter plans to city. Violation U eSMR
1121773 09/30/2023 CAT1 Total Suspended Solids (TSS), Percent Removal Monthly Average limit is 85 % and reported value was 81.9 % at EFF-001. Reduced MLSS concentrations to desired levels of ~1900 mg/L. Continue pushing for mounted DO probes in each aeration basin. Blower project progressing. Adjusted process flow for longer contact time for polymers. Pushing contact basin renovation project. Thoroughly cleaned out contact basin and all clarifiers. Using 12.5% hypochlorite in contact basin. Offered plans to city about potentially adding a disc filter between clarifiers and contact basin. Violation U eSMR
1121771 09/22/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 60.6 mg/L at EFF-001. Reduced MLSS concentrations to desired levels of ~1900 mg/L. No DO probes in aeration basins for continuous data. Currently have a trial YSI probe in aeration basin #1 and will install DO probes in each basin after trials. Blower project progressing. Adjusted process flow for better contact time for polymers. Added WE-2013 polymer tote before clarifiers. Cleaned out contact basin twice and cleaned out all clarifiers. Using 12.5% hypochlorite in contact basin. Offered future disc filter plans to city. Violation U eSMR
1121770 09/08/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 60.3 mg/L at EFF-001. Reduced MLSS concentrations to desired levels of ~1900 mg/L. No DO probes in aeration basins for continuous data. Currently have a trial YSI probe in aeration basin #1 and will install DO probes in each basin after trials. Blower project progressing. Adjusted process flow for better contact time for polymers. Added WE-2013 polymer tote before clarifiers. Cleaned out contact basin twice and cleaned out all clarifiers. Using 12.5% hypochlorite in contact basin. Offered future disc filter plans to city. Violation U eSMR
1121774 09/01/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 57 mg/L at EFF-001. Reduced MLSS concentrations to desired levels of ~1900 mg/L. No DO probes in aeration basins for continuous data. Currently have a trial YSI probe in aeration basin #1 and will install DO probes in each basin after trials. Blower project progressing. Adjusted process flow for better contact time for polymers. Added WE-2013 polymer tote before clarifiers. Cleaned out contact basin twice and cleaned out all clarifiers. Using 12.5% hypochlorite in contact basin. Offered future disc filter plans to city. Violation U eSMR
1120991 08/31/2023 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 30 mg/L and reported value was 42.4 mg/L at EFF-001. High mixed liquor concentrations. Increased wasting for solids removal from the system and are now where we want our MLSS concentrations. DO problems. No DO probes in aeration basins for continuous data. Currently have a trial YSI probe in aeration basin #3 and will install 3 DO probes after trials. Also only have two old blowers that supply air to the aeration basins and aerobic digesters. Days where despite us sending all available air to aeration basins, still not enough to reach desired DO concentrations. Currently three new blowers on-site, but need the final installation completed alongside the rest of the wiring work into SCADA. C-6262 polymer used for our centrifuge no longer separating solids effectively. Jar testing was performed. Determined that we get an improved solids separation using a different mix of polymers. Polymers C-319 and WE-2013 are now mixed in before the final product. Improved solids separation means more solids leaving in the form of cake and less being returned to the plant in the form of centrate. Cleaned out contact basin and one clarifier. Will begin the process of cleaning out another clarifier this week and the final clarifier soon after. Having our contact basin looked at for concrete repair and for a special protective coating that will protect the concrete and make cleaning even easier. Cleaning of the contact basin and clarifiers more regularly in the future. Switched from using HTH to 12.5% sodium hypochlorite in the contact basin, giving a more consistent and effective means of sterilizing not only coliforms, but algae or any organic growth that could accumulate in the basin. Offered the idea to the City of Avalon about the addition of a disc filter unit between the clarifiers and contact basin that would completely eliminate any total suspended solids problems we currently have and would keep our TSS results well below any NPDES permit limitation in the future. Violation U eSMR
1120990 08/18/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 65.6 mg/L at EFF-001. High mixed liquor concentrations. Increased wasting for solids removal from the system and are now where we want our MLSS concentrations. DO problems. No DO probes in aeration basins for continuous data. Currently have a trial YSI probe in aeration basin #3 and will install 3 DO probes after trials. Also only have two old blowers that supply air to the aeration basins and aerobic digesters. Days where despite us sending all available air to aeration basins, still not enough to reach desired DO concentrations. Currently three new blowers on-site, but need the final installation completed alongside the rest of the wiring work into SCADA. C-6262 polymer used for our centrifuge no longer separating solids effectively. Jar testing was performed. Determined that we get an improved solids separation using a different mix of polymers. Polymers C-319 and WE-2013 are now mixed in before the final product. Improved solids separation means more solids leaving in the form of cake and less being returned to the plant in the form of centrate. Cleaned out contact basin and one clarifier. Will begin the process of cleaning out another clarifier this week and the final clarifier soon after. Having our contact basin looked at for concrete repair and for a special protective coating that will protect the concrete and make cleaning even easier. Cleaning of the contact basin and clarifiers more regularly in the future. Switched from using HTH to 12.5% sodium hypochlorite in the contact basin, giving a more consistent and effective means of sterilizing not only coliforms, but algae or any organic growth that could accumulate in the basin. Offered the idea to the City of Avalon about the addition of a disc filter unit between the clarifiers and contact basin that would completely eliminate any total suspended solids problems we currently have and would keep our TSS results well below any NPDES permit limitation in the future. Violation U eSMR
1120087 07/31/2023 CAT1 Total Suspended Solids (TSS) Monthly Average limit is 30 mg/L and reported value was 51.1 mg/L at EFF-001. To prevent this problem from occurring in the future, extra polymer totes will be ordered on top of what is needed so that there is always a stockpile on hand. The facility¿s crew has been made aware of this issue and have been instructed to keep track of how many totes are on-site, with a special emphasis on the amount of polymer left in the active tote so that a new tote can be ordered immediately. Violation U eSMR
1120085 07/21/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 67.1 mg/L at EFF-001. To prevent this problem from occurring in the future, extra polymer totes will be ordered on top of what is needed so that there is always a stockpile on hand. The facility¿s crew has been made aware of this issue and have been instructed to keep track of how many totes are on-site, with a special emphasis on the amount of polymer left in the active tote so that a new tote can be ordered immediately. Violation U eSMR
1120088 07/14/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45 mg/L and reported value was 60.2 mg/L at EFF-001. To prevent this problem from occurring in the future, extra polymer totes will be ordered on top of what is needed so that there is always a stockpile on hand. The facility¿s crew has been made aware of this issue and have been instructed to keep track of how many totes are on-site, with a special emphasis on the amount of polymer left in the active tote so that a new tote can be ordered immediately. Violation U eSMR
1120086 07/07/2023 CAT1 Total Suspended Solids (TSS) Weekly Average limit is 45.0 mg/L and reported value was 46.2 mg/L at EFF-001. To prevent this problem from occurring in the future, extra polymer totes will be ordered on top of what is needed so that there is always a stockpile on hand. The facility¿s crew has been made aware of this issue and have been instructed to keep track of how many totes are on-site, with a special emphasis on the amount of polymer left in the active tote so that a new tote can be ordered immediately. Violation B eSMR
1117818 04/06/2023 CAT2 TCDD Equivalents Monthly Average limit is 0.24 pg/L and reported value was 1.23 pg/L at EFF-001. In the future, plant staff will avoid using the drying beds during rainfall events and install plugs in the drain piping connecting the drying beds to the plants process. Violation U eSMR
1106040 07/11/2022 LREP Report submitted 4 days late (Received on: 05/19/2020). Violation B Report
1113638 03/31/2022 Deficient Reporting Oil and Grease, Total Organic Carbon, and Total Dissolved Solids were sampled, packaged, and placed on a ferry boat to be picked up by a Cal Science lab courier. However, the samples were not picked up nor analyzed by the lab. A resample occurred but in April 2022. Violation B Report
1099059 11/30/2021 CAT2 TCDD Equivalents Monthly Average (Mean) limit is 0.24 pg/L and reported value was 0.501 pg/L at EFF-001. As this violation was an abnormality, we will continue monitoring to determine if it was a bad sample or if further measures need to be implemented to prevent future exceedances. Violation B eSMR
1106799 07/31/2021 CAT1 Total Suspended Solids (TSS) Monthly Average (Mean) limit is 30 mg/L and reported value was 40.05 mg/L at EFF-001. Violation B Report
1093988 07/31/2021 CAT1 Total Suspended Solids (TSS), Percent Removal Monthly Average (Mean) limit is 85.0 % and reported value was 56.6 % at EFF-001. Closely monitor influent sampling for anomalies. Violation B eSMR
1106801 07/16/2021 CAT1 Total Suspended Solids (TSS) Weekly Average (Mean) limit is 45 mg/L and reported value was 90 mg/L at EFF-001. Violation B Report
1064047 06/30/2019 Deficient Reporting Did not sample for Dissolved Oxygen Monthly. Violation B Report
1064055 06/30/2019 Deficient Reporting Did not sample for Organic Nitrogen, Total Phosphorus, Mercury and Cyanide Quarterly. Violation B Report
1064048 06/21/2019 Deficient Reporting Did not sample for Enterococcus weekly from 6/1/19 to 6/21/19. Violation B Report
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 34 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types
CAT1 = Category 1 Pollutant (Effluent Violation for Group 1 Pollutant) CAT2 = Category 2 Pollutant (Effluent Violation for Group 2 Pollutant)
Deficient Reporting = Deficient Reporting LREP = Late Report

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
452655 Admin Civil Liability Never Active
452755 Admin Civil Liability R4-2023-0034 11/08/2023 Historical
388838 Admin Civil Liability R4-2013-0004 04/17/2013 Historical
343743 Admin Civil Liability R4-2008-0003-S 02/08/2008 Historical
332241 Notice of Violation NOV 07/20/2007 Historical
316659 Notice of Violation NOV 08/04/2006 Historical
316538 Notice of Violation NOV 07/21/2006 Historical
305802 13267 Letter 13267 Letter 03/17/2006 Historical
243012 Admin Civil Liability R4-2003-0001-R 07/18/2003 Historical
245735 Admin Civil Liability R4-2003-0001 01/17/2003 Superceded
236707 Notice of Violation NOV 07/09/2001 Historical
219309 Cease and Desist Order R4-1989-0150 08/01/1989 Historical
219310 Cease and Desist Order R4-1989-0049 05/22/1989 Historical
219308 Admin Civil Liability R4-1989-0048 05/22/1989 Historical
220392 Cease and Desist Order R4-1988-0051 04/25/1988 Historical
220393 Cease and Desist Order R4-1985-0053 08/26/1985 Historical
Total Enf Actions: 16

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
51324388 B Type compliance inspection John Salguero 06/05/2024 Y 0 N/A
55295748 Prerequirement inspection Don Tsai 02/28/2024 Y 0 [Attachments]
48155538 B Type compliance inspection Andrew Choi 06/24/2022 N 0 Download
36779497 B Type compliance inspection Andrew Choi (Multiple) 06/15/2020 Y 0 N/A
34630407 Prerequirement inspection Steven Webb 11/20/2018 N 0 Download
29879563 B Type compliance inspection Jose Morales 06/12/2018 Y 0 Download
23498718 B Type compliance inspection Jose Morales 06/07/2016 Y 0 Download
14056608 A Type compliance inspection Jose Morales 04/16/2014 Y 0 Download
9331507 Prerequirement inspection Brandi Outwin-Beals (Multiple) 08/20/2012 Y 0 [Attachments]
8818099 A Type compliance inspection Craig Blett 04/11/2012 Y 0 N/A
4045882 B Type compliance inspection Kevin Arvai (Multiple) 11/11/2009 N 3 Download
2030561 A Type compliance inspection EPA Contractor 11/11/2009 Y 0 Download
1363299 Prerequirement inspection Cathy Chang 02/13/2008 Y 0 Download
906162 B Type compliance inspection Hugh Marley 05/18/2006 Y 13 N/A
338654 A Type compliance inspection Jose Morales 06/01/2005 Y 0 N/A
969163 B Type compliance inspection Jose Morales 06/01/2005 Y 0 Download
335125 A Type compliance inspection Jesus Plasenca 06/03/2004 Y 0 N/A
333106 A Type compliance inspection Jesus Plasenca 01/08/2004 Y 0 N/A
331268 A Type compliance inspection Jesus Plasenca 06/03/2003 Y 0 N/A
329092 A Type compliance inspection Jesus Plasenca 01/22/2003 Y 0 N/A
325206 A Type compliance inspection Jesus Plasenca 06/13/2002 Y 0 N/A
275302 B Type compliance inspection Cathy Chang 05/30/2001 Y 0 N/A
275301 A Type compliance inspection Mazhar Ali 06/21/2000 Y 0 N/A
275299 B Type compliance inspection Mazhar Ali 12/02/1998 Y 0 N/A
275298 A Type compliance inspection Mazhar Ali 06/10/1998 Y 0 N/A
275300 A Type compliance inspection King K Yu 01/24/1996 Y 0 N/A
Total Inspections: 26 Last Inspection: 06/05/2024
  
The current report was generated with data as of: 06/14/2024