Welcome to California
 California Home
Welcome to California - images of Golden Gate Bridge, ocean sunset, waterfall, flowers, and city skyline California Home Welcome to the California Environmental Protection Agency
 California Integrated Water Quality System Project (CIWQS)
   Facility At-A-Glance Report

  
   [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL]

  
   SEARCH CRITERIA:      [REFINE SEARCH] [NEW SEARCH] [GLOSSARY]
Place ID 205963
  
  
  
  
Hide All Show All
General Information
Region Place ID Place Name Place Type Place Address Place County
6A 205963 Apache Erosion Control Project Facility Apache Ave. Meyers, CA, El Dorado

Expand/Contract Related Parties
Related Parties
Party Party Type Party Name Role Classification Relationship Start Date Relationship End Date
14596 Organization El Dorado Cnty DOT SLT Owner County Agency 07/08/1993
Total Related Parties: 1

Expand/Contract Regulatory Measures
Regulatory Measures
Reg Measure ID Reg Measure Type Region Program Order No. WDID Effective Date Expiration Date Status Amended?
259428 Letter 6T NPDESWW LT961120 Historical N
203370 Enrollee 6T NPDNONMUNIPRCS 00-03 6A099303003 07/08/1993 Historical N
Total Reg Measures: 2

Expand/Contract Violations
Violations
Violation ID Occurred Date Violation Type (-) Violation Description Corrective Action Status Classification Source
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
Total Violations: 0 Priority Violations: 0
*Click the "(+/-) Violation Description" link to expand and contract the violation description.
*As of 5/20/2010, the Water Board's Enforcement Policy requires that all violations be classified as 1, 2 or 3, with class 1 being the highest. Prior to this, violations were simply classified as Yes or No. If a 123 classification has been assigned to a violation that occurred before this date, that classification data will be displayed instead of the Yes/No data.

Violation Types

Expand/Contract Enforcement Actions
Enforcement Actions
Enf Id Enf Type Enf Order No. Effective Date Status
Total Enf Actions: 0

Expand/Contract Inspections
Inspections
Inspection ID Inspection Type Lead Inspector Actual End Date Planned Violations Attachment
288072 Prerequirement inspection Mary Kemper 10/30/1996 Y 0 N/A
288070 B Type compliance inspection Mary Kemper 12/12/1995 Y 0 N/A
288071 B Type compliance inspection Mary Kemper 11/29/1995 Y 0 N/A
Total Inspections: 3 Last Inspection: 10/30/1996
  
The current report was generated with data as of: 05/31/2024
Regional Boards are in the process of entering backlogged data.
As a result, data may be incomplete.
Back to Main Page  |  Back to Top of Page