Violation ID |
Occurred Date |
Violation Type |
(-) Violation Description |
Corrective Action |
Status |
Classification |
Source |
1119947 |
06/07/2023 |
Order Conditions |
Violation 1. The concrete lined drainage channel that discharges runoff from the Receiving/Processing Area to the North Pad has been intentionally blocked to facilitate construction atop the North Pad, as documented in the attached 7 June 2023 Inspection Report. |
1. To address Violation 1 above, the Discharger shall submit, no later than 31 October 2023, a report documenting that the drainage channel from the Receiving/ Processing Area to the North Pad has been cleared to ensure control of all liquid drainage in accordance with the Compost General Order. |
Violation |
B |
Inspection |
1119948 |
06/07/2023 |
Order Conditions |
Violation 2. Central Valley Water Board files do not contain any documentation that the proposed expansion and lining of the North Compost Pond was ever approved by Water Board staff. could not document |
2. To address Violation 2 above, the Discharger shall immediately suspend its use of the North Compost Pond, redirect all compost leachate drainage to the South Compost Pond, and removal all liquid from the North Compost Pond. |
Violation |
B |
Inspection |
1119949 |
06/07/2023 |
Order Conditions |
Violation 3. Central Valley Water Board files do not contain a Final Post-Construction Quality Assurance (CQA) Report documenting the installation of the North Compost Leachate Pond in accordance with the Compost General Order. |
3. To address Violation 3 above, the Discharger shall submit, no later than 31 October 2023, a Final Post-Construction Quality Assurance (CQA) Report documenting the installation of the North Compost Leachate Pond in accordance with the Compost General Order. |
Violation |
B |
Inspection |
1076682 |
06/17/2020 |
UAUTHDISC |
Staff observed compost leachate flowing off the North Compost Area pad, saturating native soil adjacent to the pad and pooling in a low area between the North Compost Area pad and the green and wood waste processing area. The discharge of leachate outside the site¿s containment structure is a violation of Specification 5 and Section 1b, 1c, and 10 of the Design, Construction, and Operation Requirements All Tiers, and Section 1 of Tier II Only sections of the Composting General Order as outlined below. |
|
Violation |
B |
Inspection |
Report displays most recent five years of violations. Refer to the Interactive Violation Report for more data.
|