[SUMMARY OF FINAL SUBMITTED VERSION]


SUPPLEMENTAL STATEMENT OF WATER DIVERSION AND USE FOR REPORTING PERIOD

October 1, 2023 to September 30, 2024
Primary Owner: LOS ANGELES DEPARTMENT OF WATER AND POWER
Statement Number: S001770
Date Submitted: 01/30/2025
Water is used under
Pre-1914 Claim
Year diversion commenced 1868
Purpose of Use
Irrigation
Other LADWP supplies water for uses in Owens Valley pursuant to requirements found in Superior Court Case Number 12908 Stipulation and Order for Judgment, otherwise known as the Inyo/Los Angeles Water Agreement.
Irrigated Crops
Multiple Crops Area Irrigated (Acres) Primary Irrigation Method
Pasture No 20
Special Use Categories
Are you using any water diverted under this right for the cultivation of cannabis? No
Amount of Water Diverted and Used
Month Amount directly diverted
(Acre-Feet)
Amount diverted or collected to storage
(Acre-Feet)
Amount beneficially used
(Acre-Feet)
2023
October
0
0
0
November
0
0
0
December
0
0
0
2024
January
0
0
0
February
0
0
0
March
46.3
0
46.3
April
34.5
0
34.5
May
21.93
0
21.93
June
62.44
0
62.44
July
40.37
0
40.37
August
29.29
0
29.29
September
20.08
0
20.08
Total
254.91
0
254.91
Type of Diversion Direct Diversion Only
Comments OH 14
Water Diversion Measurement
Required to measure as of the date this report is submitted Yes
Is diversion measured? Yes
An alternative compliance plan was submitted to the division of water rights on
A request for additional time was submitted to the division of water rights on
Measurement ID numberM004278
This Device/Method was used to measure water during the current reporting periodYes
Briefly describe the measurement device or methodParshall Flume
Nickname0024
Type of device / methodFlume
Device makeLADWP
Serial numberD12, 768-1
Model number
Approximate date of installation01/14/1997
Additional info
Approximate date the measuring device was last calibrated or the measurement method was updated06/08/2017
Estimated accuracy of measurement15%
Description of calibration methodIndependent current metering using a portable flow meter
Describe the maintenance schedule for the device/method
Information for the person who last calibrated the device or designed the measurement method
NameEric Tillemans
Phone number7608730256
EmailEric.Tillemans@ladwp.com
Qualifications of the individualCalifornia-registered Professional Engineer
License number and type for the qualified individual above and/or any other relevant explanation
Type of data recorder device / methodData logger (digital)
Data recorder device makeHigh Sierra Electronics
Data recorder serial number03870
Data recorder model number3500
Data recorder units of measurement
Frequency of data recordingHourly
Additional data recorder info
I am required to report my diversion or storage data by telemetry as of the date this report is submittedNo
I report my diversion or storage date by telemetry to the following website
Measurement ID numberM004279
This Device/Method was used to measure water during the current reporting periodYes
Briefly describe the measurement device or methodPropeller Meter
Nickname0164
Type of device / methodFlow meter (propeller)
Device makeSparling
Serial number125371
Model numberFM-102-081-110-0
Approximate date of installation02/15/1990
Additional info
Approximate date the measuring device was last calibrated or the measurement method was updated08/04/1989
Estimated accuracy of measurement5%
Description of calibration methodManufacturer Calibration
Describe the maintenance schedule for the device/methodMonthly
Information for the person who last calibrated the device or designed the measurement method
NameEric Tillemans
Phone number7608730256
EmailEric.Tillemans@ladwp.com
Qualifications of the individualCalifornia-registered Professional Engineer
License number and type for the qualified individual above and/or any other relevant explanationC56197
Type of data recorder device / methodOther: Manual observation of totalizer
Data recorder device make
Data recorder serial number
Data recorder model number
Data recorder units of measurement
Frequency of data recordingMonthly
Additional data recorder info
I am required to report my diversion or storage data by telemetry as of the date this report is submittedNo
I report my diversion or storage date by telemetry to the following website
Measurement Attachments
Measurement ID Number File Name Description Size
No attachments
Measurement Data Files
Measurement ID Number File Name Description Size
M004278 S001770 - 0024.xlsx 12 KB
M004279 S001770 - 0164.xlsx 12 KB
Maximum Rate of Diversion
Month Rate of Diversion
2023
October
November
December
2024
January
February
March
April
May
June
July
August
September
Water Transfers
Water transfered No
Quantity transfered (Acre-Feet)
Dates which transfer occurred / to /
Transfer approved by
Water Supply Contracts
Water supply contract No
Contract with
Contract number
Source from which contract water was diverted
Point of diversion same as identified water right
Amount (Acre-Feet) authorized to divert under this contract
Amount (Acre-Feet) authorized to be diverted in 2024
Amount (Acre-Feet) projected for 2025
Exchange or settlement of prior rights
All monthly reported diversion claimed under the prior rights
Amount (Acre-Feet) of reported diversion solely under contract
Credits Claimed
Conservation Reclaimed Water Use Conjunctive Groundwater Use
Claimed? (Yes/No)
2023
October
November
December
2024
January
February
March
April
May
June
July
August
September
Conservation Supporting Information
Description of conservation methods
Description of baseline water use and time period
Description of conservation calculation methods
Conserved water used?
Additional Remarks
 
Attachments
File Name Description Size
No Attachments
Contact Information of the Person Submitting the Form
First Name JENNIFER
Last Name CZEKALLA
Relation to Water Right Agent
Contact Information of the Person Submitting the Form
First Name JENNIFER
Last Name CZEKALLA
Relation to Water Right Agent
Information on Certification and Signatory
Name of Person Signing and Certifying the Report Jennifer Czekalla
Date of Signature 01/30/2025