[SUMMARY OF FINAL SUBMITTED VERSION]

PROGRESS REPORT BY PERMITTEE FOR 2011

Primary Owner: EL DORADO IRRIGATION DISTRICT
Application Number: A005645B
Permit Number: 021112
Date Submitted: 2012-06-29
1. Permit Review
I have reviewed my water right permit Yes
2. Compliance with Permit Terms and Conditions
I am complying with all terms and conditions Yes
Description of noncompliance with terms and conditions
3. Changes to the Project
Intake location has been changed
Description of intake location changes
Type of use has changed
Description of type of use changes
Place of use has changed
Description of place of use changes
Other changes
Description of other changes
4-6. Permitted Project Status
Project Status Not Complete
6a. Construction work has commenced Yes
6b. Construction is completed No
6c. Beneficial uses of water has commenced Yes
6d. Project will be completed within the time period specified in the permit Yes
6e. Explanation of work remaining to be done Warren Act Contract is in process with USBR and expected to be completed in 2012. Full utilization of right will require expansion or replacement of Folsom Lake intake facilities, further expansion of the El Dorado Hills Water Treatment Plant, and transmission infrastructure improvements.
6f. Estimated date of completion 12/31/2020
7. Purpose of Use
Domestic 115000 persons
Irrigation 4100 Acres Mixed Crop Types
Municipal 5868
8. Amount of Water Diverted and Used
Month Amount directly diverted or
collected to storage
(Acre-Feet)
Amount used
(Acre-Feet)
January 0 0
February 0 0
March 0 0
April 0 0
May 0 0
June 0 0
July 0 0
August 0 0
September    0 0
October 0 0
November 0 0
December 0 0
Total 0 0
9. Maximum Rate of Diversion for each Month
Month Maximum Rate of Diversion
(CFS)
January 0
February 0
March 0
April 0
May 0
June 0
July 0
August 0
September    0
October 0
November 0
December 0
10. Storage
Reservoir name Spilled this year Feet below spillway at maximum storage Completely emptied Feet below spillway at minimum storage Method used to measure water level
Caples Lake Yes No 18.1 Staff Gage
Silver Lake No 0.1 No 19.58 Staff Gage
Lake Aloha Yes No 14.7 Staff Gage
Conservation of Water
11. Are you now employing water conservation efforts? Yes
Description of water conservation efforts The District is currently implementing water conservation best management practices, including all urban measures reported in our Urban Water Management Plan 2010 Update. Reduction/substitution volumes are District-wide and not attributable solely to this right.
12. Amount of water conserved 2646 Acre-Feet
Water Quality and Wastewater Reclamation
13. During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which unreasonably affects the water for other beneficial uses? Yes
14. Amount of reclaimed, desalinated, or polluted water used 2247 Acre-Feet
Conjuctive Use of Groundwater and Surface Water
15. During the period covered by this Report, were you using groundwater in lieu of available surface water authorized under your permit? No
16. Amounts of groundwater used
Additional Remarks
Reference Item 6d. - Yes, the project will be completed within the time period specified in the permit. A petition for extension of construction completion deadline was timely filed and is pending.
Attachments
File Name Description Size
2012.06.29 Permit 21112 Annual Report - FINAL with Attachments.pdf A005645B - 2011 Annual Report 7 MB
Attachment - Recycled Water.pdf Attachment - Recycled Water 40 KB
Contact Information of the Person Submitting the Form
First Name Brian
Last Name Mueller
Relation to Water Right Agent
Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief Yes