[SUMMARY OF FINAL SUBMITTED VERSION]
PROGRESS REPORT BY PERMITTEE FOR
2011
Primary Owner:
EL DORADO IRRIGATION DISTRICT
Application Number:
A005645B
Permit Number:
021112
Date Submitted:
2012-06-29
1. Permit Review |
I have reviewed my water right permit |
Yes
|
2. Compliance with Permit Terms and Conditions |
I am complying with all terms and conditions |
Yes
|
Description of noncompliance with terms and conditions |
|
3. Changes to the Project |
Intake location has been changed |
|
Description of intake location changes |
|
Type of use has changed |
|
Description of type of use changes |
|
Place of use has changed |
|
Description of place of use changes |
|
Other changes |
|
Description of other changes |
|
4-6. Permitted Project Status |
Project Status |
Not Complete
|
6a. Construction work has commenced |
Yes
|
6b. Construction is completed |
No
|
6c. Beneficial uses of water has commenced |
Yes
|
6d. Project will be completed within the time period specified in the permit |
Yes
|
6e. Explanation of work remaining to be done |
Warren Act Contract is in process with USBR and expected to be completed in 2012. Full utilization of right will require expansion or replacement of Folsom Lake intake facilities, further expansion of the El Dorado Hills Water Treatment Plant, and transmission infrastructure improvements. |
6f. Estimated date of completion |
12/31/2020 |
7. Purpose of Use
|
Domestic |
115000 persons
|
Irrigation |
4100
Acres
Mixed Crop Types
|
Municipal |
5868
|
8. Amount of Water Diverted and Used |
Month |
Amount directly diverted or
collected to storage
(Acre-Feet)
|
Amount used
(Acre-Feet)
|
January |
0 |
0 |
February |
0 |
0 |
March |
0 |
0 |
April |
0 |
0 |
May |
0 |
0 |
June |
0 |
0 |
July |
0 |
0 |
August |
0 |
0 |
September |
0 |
0 |
October |
0 |
0 |
November |
0 |
0 |
December |
0 |
0 |
Total |
0 |
0 |
9. Maximum Rate of Diversion for each Month |
Month |
Maximum Rate of Diversion
(CFS)
|
January |
0 |
February |
0 |
March |
0 |
April |
0 |
May |
0 |
June |
0 |
July |
0 |
August |
0 |
September |
0 |
October |
0 |
November |
0 |
December |
0 |
10. Storage |
Reservoir name |
Spilled this year |
Feet below spillway at maximum storage |
Completely emptied |
Feet below spillway at minimum storage |
Method used to measure water level |
Caples Lake |
Yes
|
|
No
|
18.1 |
Staff Gage |
Silver Lake |
No
|
0.1 |
No
|
19.58 |
Staff Gage |
Lake Aloha |
Yes
|
|
No
|
14.7 |
Staff Gage |
Conservation of Water |
11. Are you now employing water conservation efforts? |
Yes
|
Description of water conservation efforts |
The District is currently implementing water conservation best management practices, including all urban measures reported in our Urban Water Management Plan 2010 Update.
Reduction/substitution volumes are District-wide and not attributable solely to this right.
|
12. Amount of water conserved |
2646
Acre-Feet
|
Water Quality and Wastewater Reclamation |
13. During the period covered by this Report, did you use reclaimed water
from a wastewater treatment facility, water from a desalination facility,
or water polluted by waste to a degree which unreasonably affects the
water for other beneficial uses?
|
Yes
|
14. Amount of reclaimed, desalinated, or polluted water used |
2247
Acre-Feet
|
Conjuctive Use of Groundwater and Surface Water |
15. During the period covered by this Report, were you using groundwater
in lieu of available surface water authorized under your permit?
|
No
|
16. Amounts of groundwater used |
|
Additional Remarks |
Reference Item 6d. - Yes, the project will be completed within the time period specified in the permit. A petition for extension of construction completion deadline was timely filed and is pending.
|
Contact Information of the Person Submitting the Form |
First Name |
Brian |
Last Name |
Mueller |
Relation to Water Right |
Agent |
Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief |
Yes
|