PROGRESS REPORT BY PERMITTEE FOR 2011

Primary Owner: PELGER MUTUAL WATER COMPANY
Application Number: A030410
Permit Number: 020933
Date Submitted: 2012-04-02
1. Permit Review
I have reviewed my water right permit Yes
2. Compliance with Permit Terms and Conditions
I am complying with all terms and conditions Yes
Description of noncompliance with terms and conditions
3. Changes to the Project
Intake location has been changed
Description of intake location changes
Type of use has changed
Description of type of use changes
Place of use has changed
Description of place of use changes
Other changes
Description of other changes
4-6. Permitted Project Status
Project Status Complete
6a. Construction work has commenced
6b. Construction is completed
6c. Beneficial uses of water has commenced
6d. Project will be completed within the time period specified in the permit
6e. Explanation of work remaining to be done
6f. Estimated date of completion
7. Purpose of Use
Fish and Wildlife Protection and/or Enhancement Fish & Wildlife Protection and/or Enhancement
Other Rice Straw Decomp
Recreational Duck Hunting
8. Amount of Water Diverted and Used
Month Amount directly diverted or
collected to storage
(Acre-Feet)
Amount used
(Acre-Feet)
January 649 649
February 0 0
March 0 0
April 0 0
May 0 0
June 0 0
July 0 0
August 0 0
September    0 0
October 0 0
November 1265 1265
December 610 610
Total 2524 2524
9. Maximum Rate of Diversion for each Month
Month Maximum Rate of Diversion
()
January
February
March
April
May
June
July
August
September   
October
November
December
10. Storage
Reservoir name Spilled this year Feet below spillway at maximum storage Completely emptied Feet below spillway at minimum storage Method used to measure water level
           
Conservation of Water
11. Are you now employing water conservation efforts? Yes
Description of water conservation efforts Pelger Mutual Water Company is engaged in extensive water conservation efforts throughout the service area. These conservation efforts result in reductions in diversions from the Sacramento River due to improved operational practices, canal lining, maximum reuse of tailwater, and hydrologic and meteorologic conditions. The extent of beneficial water use is still in the process of being established; therefore, the quantity of water conserved has not been determined at this time.
12. Amount of water conserved 0 Acre-Feet
Water Quality and Wastewater Reclamation
13. During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which unreasonably affects the water for other beneficial uses? No
14. Amount of reclaimed, desalinated, or polluted water used
Conjuctive Use of Groundwater and Surface Water
15. During the period covered by this Report, were you using groundwater in lieu of available surface water authorized under your permit? No
16. Amounts of groundwater used
Additional Remarks
          
Attachments
File Name Description Size
No Attachments
Contact Information of the Person Submitting the Form
First Name MBK Engineers
Last Name MBK Engineers
Relation to Water Right Agent
Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief Yes