[SUMMARY OF FINAL SUBMITTED VERSION]

PROGRESS REPORT BY PERMITTEE FOR 2010

Primary Owner: PROVIDENT IRRIGATION DISTRICT
Application Number: A030813
Permit Number: 021133
Date Submitted: 2011-07-01
Compliance with Permit Terms and Conditions
I have reviewed my water right permit Yes
I am complying with all terms and conditions Yes
Description of noncompliance with terms and conditions
Intake location has been changed
Description of intake location changes
Type of use has changed
Description of type of use changes
Place of use has changed
Description of place of use changes
Permitted Project Status
Project Status Not Complete
Construction work has commenced Yes
Construction is completed Yes
Beneficial uses of water has commenced Yes
Project will be completed within the time period specified in the permit Yes
Explanation of work remaining to be done The Irrigation System is in place but still need to complete full benefical use of water.
Estimated date of completion 12/31/2012
Purpose of Use
Fish and Wildlife Protection and/or Enhancement Habitat
Other Decomp and habitat
Irrigation 10036.9 Acres Other
Recreational Duck Hunt
Month Amount directly diverted or
collected to storage
(Acre-Feet)
Amount used
(Acre-Feet)
January 0 0
February 0 0
March 0 0
April 0 0
May 0 0
June 0 0
July 0 0
August 0 0
September    0 0
October 10844 10844
November 10604 10604
December 2266 2266
Total 23714 23714
Month Maximum Rate of Diversion
(CFS)
January 0
February 0
March 0
April 0
May 0
June 0
July 0
August 0
September    0
October 181
November 181
December 50
Reservoir name Spilled this year Feet below spillway at maximum storage Completely emptied Feet below spillway at minimum storage Method used to measure water level
           
Conservation of Water
Are you now employing water conservation efforts? Yes
Description of water conservation efforts The District has worked with landowners and farmers within the places of use of these Licenses to implement good water managment and good farming practices including but not limited to laser leveling of fields, varietal changes, and crop shifts. In addition, the District operates an extensive tail water recovey and recirculation system and has implemented strict policies limiting spills from fields during the irrigation season. The District also has a USBR approved water conservation plan. The quantity of water conserved through the actions taken by individual landowners and farmers has not been determined.
Amount of water conserved 3000 Acre-Feet
Water Quality and Wastewater Reclamation
During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which unreasonably affects the water for other beneficial uses? No
Amount of reclaimed, desalinated, or polluted water used
Conjuctive Use of Groundwater and Surface Water
During the period covered by this Report, were you using groundwater in lieu of available surface water authorized under your permit? No
Amounts of groundwater used
Additional Remarks
          
Attachments
File Name Size
No Attachments
Contact Information of the Person Submitting the Form
First Name Lance
Last Name Boyd
Relation to Water Right Authorized Official
Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief Yes