[SUMMARY OF FINAL SUBMITTED VERSION]

PROGRESS REPORT BY PERMITTEE FOR 2010

Primary Owner: SACRAMENTO MUNICIPAL UTILITY DISTRICT
Application Number: A031596
Permit Number: 021262
Date Submitted: 2012-06-11
1. Permit Review
I have reviewed my water right permit Yes
2. Compliance with Permit Terms and Conditions
I am complying with all terms and conditions Yes
Description of noncompliance with terms and conditions
3. Changes to the Project
Intake location has been changed
Description of intake location changes
Type of use has changed
Description of type of use changes
Place of use has changed
Description of place of use changes
Other changes
Description of other changes
4-6. Permitted Project Status
Project Status Not Complete
6a. Construction work has commenced Yes
6b. Construction is completed Yes
6c. Beneficial uses of water has commenced Yes
6d. Project will be completed within the time period specified in the permit Yes
6e. Explanation of work remaining to be done The order approving the issuance of the permit contains the rationale for continuing.
6f. Estimated date of completion 12/31/2040
7. Purpose of Use
Power 559 MW
Recreational Boating, fishing, water contact sport
8. Amount of Water Diverted and Used
Month Amount directly diverted or
collected to storage
(Acre-Feet)
Amount used
(Acre-Feet)
January 636 78
February 458 227
March 475 352
April 325 2656
May 944 1215
June 4436 2370
July 273 174
August 609 1629
September    1684 863
October 4072 4155
November 1586 834
December 4037 3362
Total 19535 17915
9. Maximum Rate of Diversion for each Month
Month Maximum Rate of Diversion
()
January
February
March
April
May
June
July
August
September   
October
November
December
10. Storage
Reservoir name Spilled this year Feet below spillway at maximum storage Completely emptied Feet below spillway at minimum storage Method used to measure water level
Camino No 5 No 18 incremental level encoder
Junction Yes No 43 pressure transducer
Brush Creek No 2 No 18 pressure transducer
Slab Creek Yes No 34 incremental level encoder
Conservation of Water
11. Are you now employing water conservation efforts?           
Description of water conservation efforts
12. Amount of water conserved
Water Quality and Wastewater Reclamation
13. During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which unreasonably affects the water for other beneficial uses?           
14. Amount of reclaimed, desalinated, or polluted water used
Conjuctive Use of Groundwater and Surface Water
15. During the period covered by this Report, were you using groundwater in lieu of available surface water authorized under your permit?           
16. Amounts of groundwater used
Additional Remarks
          
Attachments
File Name Description Size
No Attachments
Contact Information of the Person Submitting the Form
First Name Dudley
Last Name McFadden
Relation to Water Right Authorized Official
Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief Yes