[SUMMARY OF FINAL SUBMITTED VERSION]

PROGRESS REPORT BY PERMITTEE FOR 2010

Primary Owner: EL DORADO IRRIGATION DISTRICT
Application Number: A005645B
Permit Number: 021112
Date Submitted: 2011-06-30
Compliance with Permit Terms and Conditions
I have reviewed my water right permit Yes
I am complying with all terms and conditions Yes
Description of noncompliance with terms and conditions
Intake location has been changed
Description of intake location changes
Type of use has changed
Description of type of use changes
Place of use has changed
Description of place of use changes
Permitted Project Status
Project Status Not Complete
Construction work has commenced Yes
Construction is completed No
Beneficial uses of water has commenced Yes
Project will be completed within the time period specified in the permit Yes
Explanation of work remaining to be done Warren Act Contract is in process with USBR and expected to be completed in 2011. Full utilization of right will require expansion or replacement of Folsom Lake intake facilities, further expansion of the El Dorado Hill Water Treatment Plant, and transmission infrastructure improvements
Estimated date of completion 12/31/2020
Purpose of Use
No Use
Month Amount directly diverted or
collected to storage
(Acre-Feet)
Amount used
(Acre-Feet)
January 0 0
February 0 0
March 0 0
April 0 0
May 0 0
June 0 0
July 0 0
August 0 0
September    0 0
October 0 0
November 0 0
December 0 0
Total 0 0
Month Maximum Rate of Diversion
(CFS)
January 0
February 0
March 0
April 0
May 0
June 0
July 0
August 0
September    0
October 0
November 0
December 0
Reservoir name Spilled this year Feet below spillway at maximum storage Completely emptied Feet below spillway at minimum storage Method used to measure water level
Caples Lake Yes No 21.13 Staff gage
Lake Aloha Yes No 16.46 Staff gage
Silver Lake No 0.02 No 20.27 Staff gage
Conservation of Water
Are you now employing water conservation efforts? Yes
Description of water conservation efforts The District is currently implementing water conservation best management practices, including all urban measures reported in our Urban Water Management Plan 2005 Update; and all agricultural measures reported in our USBR Five-Year Water Management Plan Update. Reduction/substitution volumes are District-wide and not attributable solely to this right.
Amount of water conserved 2631 Acre-Feet
Water Quality and Wastewater Reclamation
During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which unreasonably affects the water for other beneficial uses? Yes
Amount of reclaimed, desalinated, or polluted water used 2063 Acre-Feet
Conjuctive Use of Groundwater and Surface Water
During the period covered by this Report, were you using groundwater in lieu of available surface water authorized under your permit? No
Amounts of groundwater used
Additional Remarks
Please note the primary contact and agent name for mail and reporting has been changed to: Brian Mueller, P.E. El Dorado Irrigation District 2890 Mosquito Rd. Placerville, CA 95667 (530) 642-4029 bmueller@eid.org
Attachments
File Name Size
A005645B - Permit 21112 Report for 2010.pdf 1 MB
Attachment - Recycled Water.docx 18 KB
Contact Information of the Person Submitting the Form
First Name Brian
Last Name Mueller
Relation to Water Right Agent
Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief Yes