[SUMMARY OF FINAL SUBMITTED VERSION]

PROGRESS REPORT BY PERMITTEE FOR 2014

Primary Owner: EL DORADO IRRIGATION DISTRICT
Primary Contact: Brian Mueller

Date Submitted: 2015-06-30

Application Number: A005645B
Permit Number: 021112

Source(s) of Water POD Parcel Number County
CAPLES LAKE Alpine
LAKE ALOHA El Dorado
SILVER LAKE Amador
SOUTH FORK AMERICAN RIVER El Dorado

MAX Direct Diversion Rate: 156.0 CFS
MAX Collection to Storage: 32931.0 AC-FT
Face Value: 47931.0 AC-FT

Permitted Use(s) Acres Direct Diversion Season Storage Season
Domestic 0.0 11/01 to 07/30
11/01 to 07/31
Irrigation 0.0 11/01 to 07/31
11/01 to 07/31
Municipal 0.0 11/01 to 07/31
11/01 to 07/31
1. Permit Review
I have reviewed my water right permit Yes
2. Compliance with Permit Terms and Conditions
I am complying with all terms and conditions Yes
Description of noncompliance with terms and conditions
3. Changes to the Project
Intake location has been changed
Description of intake location changes
Type of use has changed
Description of type of use changes
Place of use has changed
Description of place of use changes
Other changes
Description of other changes
4-6. Permitted Project Status
Project Status Not Complete
6a. Construction work has commenced Yes
6b. Construction is completed No
6c. Beneficial uses of water has commenced Yes
6d. Project will be completed within the time period specified in the permit Yes
6e. Explanation of work remaining to be done Warren Act Contract executed and permit exercised in 2015. Full utilization of right will require expansion or replacement of Folsom Lake intake facilities, further expansion of the El Dorado Hills Water Treatment Plant, and transmission infrastructure improvements.
6f. Estimated date of completion 12/31/2020
7. Purpose of Use
No Use
8. Amount of Water Diverted and Used
Month Amount directly diverted
(Acre-Feet)
Amount diverted or
collected to storage
(Acre-Feet)
Amount used
(Acre-Feet)
January 0 0 0
February 0 0 0
March 0 0 0
April 0 0 0
May 0 0 0
June 0 0 0
July 0 0 0
August 0 0 0
September    0 0 0
October 0 0 0
November 0 0 0
December 0 0 0
Total 0 0 0
Comments Construction not complete.
Water Transfers
8e. Water transfered No
8f. Quantity transfered (Acre-Feet)
8g. Dates which transfer occurred / to /
8h. Transfer approved by
Water Supply Contracts
8i. Water supply contract Yes
8j. Contract with USBR
8k. Other provider N/A
8l. Contract number N/A
8m. Source from which contract water was diverted N/A
8n. Point of diversion same as identified water right Yes
8o. Amount (Acre-Feet) authorized to divert under this contract 0
8p. Amount (Acre-Feet) authorized to be diverted in 2014 0
8q. Amount (Acre-Feet) projected for 2015 0
8r. Exchange or settlement of prior rights No
8s. All monthly reported diversion claimed under the prior rights No
8t. Amount (Acre-Feet) of reported diversion solely under contract 0
9. Maximum Rate of Diversion for each Month
Month Maximum Rate of Diversion
(CFS)
January 0
February 0
March 0
April 0
May 0
June 0
July 0
August 0
September    0
October 0
November 0
December 0
10. Storage
Reservoir name Spilled this year Feet below spillway at maximum storage Completely emptied Feet below spillway at minimum storage Method used to measure water level
Caples Lake No 1.26 No 18.07 Staff gage
Silver Lake Yes No 18.3 Staff gage
Lake Aloha No 0.64 Yes Staff gage
Conservation of Water
11. Are you now employing water conservation efforts? Yes
Description of water conservation efforts During the reporting period, the District implemented water conservation best management practices, including all urban measures reported in the District's Urban Water Management Plan 2010 Update, and all agricultural measures reported in the District's USBR Five-Year Water Management Plan Update. Reduction/substitution volumes are District-wide and not attributable solely to this right.
12. Amount of water conserved 2721 Acre-Feet
Water Quality and Wastewater Reclamation
13. During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which unreasonably affects the water for other beneficial uses? Yes
14. Amount of reclaimed, desalinated, or polluted water used 2413 Acre-Feet
Conjuctive Use of Groundwater and Surface Water
15. During the period covered by this Report, were you using groundwater in lieu of available surface water authorized under your permit? No
16. Amounts of groundwater used
Additional Remarks
The information reported under Water Supply Contracts are District-wide and not attributed solely to this right. The volumes authorized for diversion in 2014 and projected for diversion in 2015 are allocated by federal water year (March - February) according to contract terms and conditions.
Attachments
File Name Description Size
2014 Annual Operations Report.pdf A005645B - 2014 Annual Operations Report 3 MB
Attachment - Recycled Water.pdf Recycled Water Attachment 40 KB
Attachment - Water Supply Contract 2014.pdf Attachment - Water Supply Contract 2014 58 KB
Contact Information of the Person Submitting the Form
First Name Brian
Last Name Mueller
Relation to Water Right Primary Owner of Record
Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief Yes