[SUMMARY OF FINAL SUBMITTED VERSION]
PROGRESS REPORT BY PERMITTEE FOR
2012
Primary Owner:
MAXWELL IRRIGATION DISTRICT
Primary Contact:
MBK ENGINEERS
Date Submitted:
2013-06-18
Application Number:
A030445
Permit Number:
021004
MAX Direct Diversion Rate:
186.0
CFS
MAX Collection to Storage:
0.0
AC-FT
Face Value:
13630.0
AC-FT
1. Permit Review |
I have reviewed my water right permit |
Yes
|
2. Compliance with Permit Terms and Conditions |
I am complying with all terms and conditions |
Yes
|
Description of noncompliance with terms and conditions |
|
3. Changes to the Project |
Intake location has been changed |
|
Description of intake location changes |
|
Type of use has changed |
|
Description of type of use changes |
|
Place of use has changed |
|
Description of place of use changes |
|
Other changes |
|
Description of other changes |
|
4-6. Permitted Project Status |
Project Status |
Not Complete
|
6a. Construction work has commenced |
Yes
|
6b. Construction is completed |
No
|
6c. Beneficial uses of water has commenced |
Yes
|
6d. Project will be completed within the time period specified in the permit |
Yes
|
6e. Explanation of work remaining to be done |
Maxwell Irrigation received Prop 50 Grant funds to complete construction of satisfactory devices to meter flows. Construction is scheduled to be complete in 2014. |
6f. Estimated date of completion |
01/01/2015 |
7. Purpose of Use
|
Fish and Wildlife Protection and/or Enhancement |
0
|
Irrigation |
6813
Acres
Rice
|
Recreational |
0
|
8. Amount of Water Diverted and Used |
Month |
Amount directly diverted or
collected to storage
(Acre-Feet)
|
Amount used
(Acre-Feet)
|
January |
3180 |
2385 |
February |
2250 |
1688 |
March |
1215 |
911 |
April |
0 |
0 |
May |
0 |
0 |
June |
0 |
0 |
July |
0 |
0 |
August |
0 |
0 |
September |
0 |
0 |
October |
1980 |
1485 |
November |
2350 |
1763 |
December |
520 |
390 |
Total |
11495 |
8622 |
Comments |
|
9. Maximum Rate of Diversion for each Month |
Month |
Maximum Rate of Diversion
(CFS)
|
January |
186 |
February |
186 |
March |
186 |
April |
0 |
May |
0 |
June |
0 |
July |
0 |
August |
0 |
September |
0 |
October |
186 |
November |
186 |
December |
186 |
10. Storage |
Reservoir name |
Spilled this year |
Feet below spillway at maximum storage |
Completely emptied |
Feet below spillway at minimum storage |
Method used to measure water level |
|
|
|
|
|
|
Conservation of Water |
11. Are you now employing water conservation efforts? |
Yes
|
Description of water conservation efforts |
We are continuing efforts with GCID to enhance our tail-water recovery program. Maxwell Irrigation and GCID are part of the 7 Party Agreement within the Colusa Basin Drainage system.
|
12. Amount of water conserved |
|
Water Quality and Wastewater Reclamation |
13. During the period covered by this Report, did you use reclaimed water
from a wastewater treatment facility, water from a desalination facility,
or water polluted by waste to a degree which unreasonably affects the
water for other beneficial uses?
|
No
|
14. Amount of reclaimed, desalinated, or polluted water used |
|
Conjuctive Use of Groundwater and Surface Water |
15. During the period covered by this Report, were you using groundwater
in lieu of available surface water authorized under your permit?
|
Yes
|
16. Amounts of groundwater used |
150
Acre-Feet
|
Attachments |
File Name |
Description |
Size |
No Attachments |
Contact Information of the Person Submitting the Form |
First Name |
Daniel |
Last Name |
Ruiz |
Relation to Water Right |
Authorized Official |
Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief |
Yes
|