[SUMMARY OF FINAL SUBMITTED VERSION]
PROGRESS REPORT BY PERMITTEE FOR
2012
Primary Owner:
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Primary Contact:
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Date Submitted:
2013-06-13
Application Number:
A031595
Permit Number:
021261
MAX Direct Diversion Rate:
1910.0
CFS
MAX Collection to Storage:
3610.0
AC-FT
Face Value:
413610.0
AC-FT
1. Permit Review |
I have reviewed my water right permit |
Yes
|
2. Compliance with Permit Terms and Conditions |
I am complying with all terms and conditions |
No
|
Description of noncompliance with terms and conditions |
Term 5, subpart B, collection to storage at Robbs Peak Reservoir exceeded permitted 100 afa; reason attached
|
3. Changes to the Project |
Intake location has been changed |
|
Description of intake location changes |
|
Type of use has changed |
|
Description of type of use changes |
|
Place of use has changed |
|
Description of place of use changes |
|
Other changes |
|
Description of other changes |
|
4-6. Permitted Project Status |
Project Status |
Not Complete
|
6a. Construction work has commenced |
Yes
|
6b. Construction is completed |
Yes
|
6c. Beneficial uses of water has commenced |
Yes
|
6d. Project will be completed within the time period specified in the permit |
Yes
|
6e. Explanation of work remaining to be done |
Item 13 in order issuing permit includes rationale for waiting until the date of completion. |
6f. Estimated date of completion |
12/31/2040 |
7. Purpose of Use
|
Fish and Wildlife Protection and/or Enhancement |
At Buck Island Reservoir
|
Power |
706
MW
|
Recreational |
Boating, fishing, water contact sport
|
8. Amount of Water Diverted and Used |
Month |
Amount directly diverted or
collected to storage
(Acre-Feet)
|
Amount used
(Acre-Feet)
|
January |
31 |
0 |
February |
7 |
0 |
March |
367 |
0 |
April |
1269 |
1260 |
May |
43 |
37 |
June |
713 |
0 |
July |
3 |
298 |
August |
17 |
483 |
September |
0 |
222 |
October |
210 |
105 |
November |
1177 |
70 |
December |
282 |
1122 |
Total |
4119 |
3597 |
Comments |
|
9. Maximum Rate of Diversion for each Month |
Month |
Maximum Rate of Diversion
()
|
January |
|
February |
|
March |
|
April |
|
May |
|
June |
|
July |
|
August |
|
September |
|
October |
|
November |
|
December |
|
10. Storage |
Reservoir name |
Spilled this year |
Feet below spillway at maximum storage |
Completely emptied |
Feet below spillway at minimum storage |
Method used to measure water level |
Rubicon Reservoir |
Yes
|
|
No
|
12 |
Incremental Level Encoder |
Buck Island Reservoir |
Yes
|
|
No
|
11 |
Incremental Level Encoder |
Gerle Creek Reservoir |
Yes
|
|
No
|
10 |
Pressure Transducer |
Robbs Peak Reservoir |
Yes
|
|
No
|
14 |
Incremental Level Encoder |
Conservation of Water |
11. Are you now employing water conservation efforts? |
|
Description of water conservation efforts |
|
12. Amount of water conserved |
|
Water Quality and Wastewater Reclamation |
13. During the period covered by this Report, did you use reclaimed water
from a wastewater treatment facility, water from a desalination facility,
or water polluted by waste to a degree which unreasonably affects the
water for other beneficial uses?
|
|
14. Amount of reclaimed, desalinated, or polluted water used |
|
Conjuctive Use of Groundwater and Surface Water |
15. During the period covered by this Report, were you using groundwater
in lieu of available surface water authorized under your permit?
|
|
16. Amounts of groundwater used |
|
Additional Remarks |
Regarding excess collection to storage, Term 5, part B, Robbs Peak Reservoir: During the collection season October 2011 through September 2012, significant collection occurred in November after a routine maintenance outage (60 acre feet) and signficant refill occured in June after another routine maintenance outage (98 acre feet) as well as smaller amounts, altogether totaling 210 acre feet. The capacity of the reservoir is 140 acre feet. The total diversion through adjacent Robbs Peak Powerhouse was 124,000 acre feet over that same period. Attached to this progress report is a chart showing how storage fluctuation in the reservoir was determined to be either regulation or collection (including refill).
|
Contact Information of the Person Submitting the Form |
First Name |
Dudley |
Last Name |
McFadden |
Relation to Water Right |
Authorized Official |
Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief |
Yes
|