[SUMMARY OF FINAL SUBMITTED VERSION]
PROGRESS REPORT BY PERMITTEE FOR
2012
Primary Owner:
SOUTH SUTTER WATER DISTRICT
Primary Contact:
MBK ENGINEERS
Date Submitted:
2013-06-25
Application Number:
A026162
Permit Number:
018360
MAX Direct Diversion Rate:
725.0
CFS
MAX Collection to Storage:
103100.0
AC-FT
Face Value:
627983.7
AC-FT
| 1. Permit Review |
| I have reviewed my water right permit |
Yes
|
| 2. Compliance with Permit Terms and Conditions |
| I am complying with all terms and conditions |
Yes
|
| Description of noncompliance with terms and conditions |
|
| 3. Changes to the Project |
| Intake location has been changed |
|
| Description of intake location changes |
|
| Type of use has changed |
|
| Description of type of use changes |
|
| Place of use has changed |
|
| Description of place of use changes |
|
| Other changes |
|
| Description of other changes |
|
| 4-6. Permitted Project Status |
| Project Status |
Complete
|
| 6a. Construction work has commenced |
|
| 6b. Construction is completed |
|
| 6c. Beneficial uses of water has commenced |
|
| 6d. Project will be completed within the time period specified in the permit |
|
| 6e. Explanation of work remaining to be done |
|
| 6f. Estimated date of completion |
|
|
7. Purpose of Use
|
| Power |
10500
hp
|
| 8. Amount of Water Diverted and Used |
| Month |
Amount directly diverted or
collected to storage
(Acre-Feet)
|
Amount used
(Acre-Feet)
|
| January |
6398 |
0 |
| February |
2226 |
0 |
| March |
42484 |
22155 |
| April |
38962 |
39162 |
| May |
29123 |
29502 |
| June |
0 |
0 |
| July |
0 |
0 |
| August |
0 |
0 |
| September |
0 |
0 |
| October |
811 |
0 |
| November |
10068 |
0 |
| December |
96227 |
33826 |
| Total |
226299 |
124645 |
| Comments |
|
| 9. Maximum Rate of Diversion for each Month |
| Month |
Maximum Rate of Diversion
()
|
| January |
|
| February |
|
| March |
|
| April |
|
| May |
|
| June |
|
| July |
|
| August |
|
| September |
|
| October |
|
| November |
|
| December |
|
| 10. Storage |
| Reservoir name |
Spilled this year |
Feet below spillway at maximum storage |
Completely emptied |
Feet below spillway at minimum storage |
Method used to measure water level |
| Camp Far West Dam |
Yes
|
|
No
|
63 |
Staff Gage |
| Conservation of Water |
| 11. Are you now employing water conservation efforts? |
No
|
| Description of water conservation efforts |
|
| 12. Amount of water conserved |
|
| Water Quality and Wastewater Reclamation |
|
13. During the period covered by this Report, did you use reclaimed water
from a wastewater treatment facility, water from a desalination facility,
or water polluted by waste to a degree which unreasonably affects the
water for other beneficial uses?
|
No
|
| 14. Amount of reclaimed, desalinated, or polluted water used |
|
| Conjuctive Use of Groundwater and Surface Water |
|
15. During the period covered by this Report, were you using groundwater
in lieu of available surface water authorized under your permit?
|
No
|
| 16. Amounts of groundwater used |
|
| Attachments |
| File Name |
Description |
Size |
| No Attachments |
| Contact Information of the Person Submitting the Form |
| First Name |
MBK Engineers |
| Last Name |
MBK Engineers |
| Relation to Water Right |
Agent |
| Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief |
Yes
|