[SUMMARY OF FINAL SUBMITTED VERSION]
PROGRESS REPORT BY PERMITTEE FOR
2012
Primary Owner:
EL DORADO IRRIGATION DISTRICT
Primary Contact:
Brian
Mueller
Date Submitted:
2013-06-20
Application Number:
A005645B
Permit Number:
021112
MAX Direct Diversion Rate:
156.0
CFS
MAX Collection to Storage:
32931.0
AC-FT
Face Value:
47931.0
AC-FT
1. Permit Review |
I have reviewed my water right permit |
Yes
|
2. Compliance with Permit Terms and Conditions |
I am complying with all terms and conditions |
Yes
|
Description of noncompliance with terms and conditions |
|
3. Changes to the Project |
Intake location has been changed |
|
Description of intake location changes |
|
Type of use has changed |
|
Description of type of use changes |
|
Place of use has changed |
|
Description of place of use changes |
|
Other changes |
|
Description of other changes |
|
4-6. Permitted Project Status |
Project Status |
Not Complete
|
6a. Construction work has commenced |
Yes
|
6b. Construction is completed |
No
|
6c. Beneficial uses of water has commenced |
Yes
|
6d. Project will be completed within the time period specified in the permit |
Yes
|
6e. Explanation of work remaining to be done |
Warren Act Contract is in process with USBR and expected to be completed
in 2012. Full utilization of right will require expansion or replacement of
Folsom Lake intake facilities, further expansion of the El Dorado Hills Water
Treatment Plant, and transmission infrastructure improvements. |
6f. Estimated date of completion |
12/31/2020 |
8. Amount of Water Diverted and Used |
Month |
Amount directly diverted or
collected to storage
(Acre-Feet)
|
Amount used
(Acre-Feet)
|
January |
0 |
0 |
February |
0 |
0 |
March |
0 |
0 |
April |
0 |
0 |
May |
0 |
0 |
June |
0 |
0 |
July |
0 |
0 |
August |
0 |
0 |
September |
0 |
0 |
October |
0 |
0 |
November |
0 |
0 |
December |
0 |
0 |
Total |
0 |
0 |
Comments |
Construction not complete |
9. Maximum Rate of Diversion for each Month |
Month |
Maximum Rate of Diversion
(CFS)
|
January |
0 |
February |
0 |
March |
0 |
April |
0 |
May |
0 |
June |
0 |
July |
0 |
August |
0 |
September |
0 |
October |
0 |
November |
0 |
December |
0 |
10. Storage |
Reservoir name |
Spilled this year |
Feet below spillway at maximum storage |
Completely emptied |
Feet below spillway at minimum storage |
Method used to measure water level |
Caples Lake |
No
|
4.87 |
No
|
21.48 |
Staff Gage |
Silver Lake |
Yes
|
|
No
|
20.92 |
Staff Gage |
Lake Aloha |
No
|
0.05 |
No
|
14.7 |
Staff Gage |
Conservation of Water |
11. Are you now employing water conservation efforts? |
Yes
|
Description of water conservation efforts |
The District is currently implementing water conservation best management practices, including all urban measures reported in our Urban Water Management Plan 2010 Update.
Reduction/substitution volumes are District-wide and not attributable solely to this right.
|
12. Amount of water conserved |
2661
Acre-Feet
|
Water Quality and Wastewater Reclamation |
13. During the period covered by this Report, did you use reclaimed water
from a wastewater treatment facility, water from a desalination facility,
or water polluted by waste to a degree which unreasonably affects the
water for other beneficial uses?
|
Yes
|
14. Amount of reclaimed, desalinated, or polluted water used |
2853
Acre-Feet
|
Conjuctive Use of Groundwater and Surface Water |
15. During the period covered by this Report, were you using groundwater
in lieu of available surface water authorized under your permit?
|
No
|
16. Amounts of groundwater used |
|
Contact Information of the Person Submitting the Form |
First Name |
Brian |
Last Name |
Mueller |
Relation to Water Right |
Agent |
Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief |
Yes
|