1109382 |
10/11/2022 |
Deficient Reporting |
Instead of one comprehensive feasibility study, the Central Coast Water Board received one feasibility study prepared by Geosyntec Consultants and Weaver Consultants Group on behalf of Tecknit, Inc. (Tecknit FS) and a second feasibility study prepared by Haley and Aldrich on behalf of Tube Holding Company, Inc. (THC FS). Neither of these feasibility studies, either separately or jointly, propose a complete path toward remediation of the Site. Therefore, they are inadequate, non-compliant with, and a violation of requirement 6a of CAO No. R3-2020-0012. |
Violation |
N |
Report |
Former Tecknit and Tube Holding |
222056 |
94-49 |
N |