[SUMMARY OF FINAL SUBMITTED VERSION]


PROGRESS REPORT BY PERMITTEE FOR 2019

Primary Owner: SKYLAWN MEMORIAL PARK
Primary Contact:

Date Submitted: 06/20/2020

Application Number: A025198
Permit Number: 017487

Source(s) of Water POD Parcel Number County
UNST San Mateo

MAX Direct Diversion Rate: 0 GPD
MAX Collection to Storage: 49 AC-FT
Face Value: 49 AC-FT

Permitted Use(s) Acres Direct Diversion Season Storage Season
Irrigation 76 01/01 to 03/31
1. Compliance with Permit Terms and Conditions
I have reviewed my water right permit and I am complying with all terms and conditions Yes
Description of noncompliance with terms and conditions
2. Changes to the Project
Intake location has been changed
Description of intake location changes
Type of use has changed
Description of type of use changes
Place of use has changed
Description of place of use changes
Other changes
Description of other changes
3-5. Permitted Project Status
Project Status Not Complete
5a. Construction work has commenced No
5b. Construction is completed No
5c. Beneficial uses of water has commenced No
5d. Project will be completed within the time period specified in the permit No
5e. Explanation of work remaining to be done I am the new GM at Skylawn. After reviewing the water rights and associated permits with Damon Hess on 10/23/2018, we found that construction for the diversion had not begun. We need some guidance on whee this is, as we'd like to utilize teh water.
5f. Estimated date of completion 10/31/2024
6. Purpose of Use
No Use
Special Use Categories
C1. Are you using any water diverted under this right for the cultivation of cannabis? No
7. Amount of Water Diverted and Used
Month Amount directly diverted
(Acre-Feet)
Amount diverted or
collected to storage
(Acre-Feet)
Amount used
(Acre-Feet)
January 0 0 0
February 0 0 0
March 0 0 0
April 0 0 0
May 0 0 0
June 0 0 0
July 0 0 0
August 0 0 0
September    0 0 0
October 0 0 0
November 0 0 0
December 0 0 0
Total 0 0 0
Type of Diversion No Diversion
Comments Skylawn wishes to pursue development needed for this water right.
8. Water Diversion Measurement
a. Required to measure as of the date this report is submitted No
b. Is diversion measured? No
c. An alternative compliance plan was submitted to the division of water rights on
d. A request for additional time was submitted to the division of water rights on
Measurement Attachments
Measurement ID Number File Name Description Size
No attachments
Measurement Data Files
Measurement ID Number File Name Description Size
No data files
9. Maximum Rate of Diversion
Month Rate of Diversion (Gallons Per Minute)
January 0
February 0
March 0
April 0
May 0
June 0
July 0
August 0
September 0
October 0
November 0
December 0
10.Water Transfers
10a. Water transfered No
10b. Quantity transfered (Acre-Feet)
10c. Dates which transfer occurred / to /
10d. Transfer approved by
Water Supply Contracts
10e. Water supply contract No
10f. Contract with
10g. Other provider
10h. Contract number
10i. Source from which contract water was diverted
10j. Point of diversion same as identified water right
10k. Amount (Acre-Feet) authorized to divert under this contract
10l. Amount (Acre-Feet) authorized to be diverted in 2019
10m. Amount (Acre-Feet) projected for 2020
10n. Exchange or settlement of prior rights
10o. All monthly reported diversion claimed under the prior rights
10p. Amount (Acre-Feet) of reported diversion solely under contract
11. Storage
Reservoir name Spilled this year Feet below spillway at maximum storage Completely emptied Feet below spillway at minimum storage Method used to measure water level
Reservoir  No 5 Yes Visual Estimate
Conservation of Water
12. Are you now employing water conservation efforts? Yes
Description of water conservation efforts Upgrade of irrigation system to more efficient sprinkler heads, only watering when necessary, use of drought tolerant planting.
13. Amount of water conserved
Water Quality and Wastewater Reclamation
14. During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which unreasonably affects the water for other beneficial uses? No
15. Amount of reclaimed, desalinated, or polluted water used
Conjuctive Use of Groundwater and Surface Water
16. During the period covered by this Report, were you using groundwater in lieu of available surface water authorized under your permit? No
17. Amounts of groundwater used
Additional Remarks
 
Attachments
File Name Description Size
No Attachments
Contact Information of the Person Submitting the Form
First Name Richard
Last Name McCown
Relation to Water Right Primary Owner of Record
Information on Certification and Signatory
Name of Person Signing and Certifying the Report Richard McCown
Date of Signature 06/20/2020